My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002952
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
3500 - Local Oversight Program
>
PR0545250
>
ARCHIVED REPORTS_XR0002952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2020 5:42:15 PM
Creation date
1/30/2020 4:27:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002952
RECORD_ID
PR0545250
PE
3528
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6ETTLER - RYAN /NC.`r- 1P � � <br /> 00 ji13 PM J* 36 <br /> June 12, 2000 <br /> Ms Carol Oz <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> Subjt ct: Tosco (Former BP Oil) Station No 11193 3202 Hammer Lane, Stockton, CA <br /> Dear Ms Carol Oz <br /> At the request of Tosco Marketing Company (Tosco), Gettler-Ryan Inc (GR) has prepared this letter in <br /> response to your April 19, 2000, correspondence regarding the subject site The purpose of this letter is to <br /> address your comments, numbered 1 and 4 <br /> The information you requested(in comment 1)is attached The work plan involves the use of a truck mounted <br /> vacuum pump This pump will not be installed in the well A hose will provide the connection between the <br /> pump and the groundwater in wells MW-1 and MW-2 The groundwater will pass through the pump and into <br /> a tankcr truck for delivery to the Tosco refinery The pump model is RFL 100, manufactured by Mannesman <br /> Demag Technical data for the RFL 100 provided by Onyx Industrial Services, Inc (Onyx) is enclosed with <br /> this letter However, Onyx has informed GR that operating rates up to 170 gallons per minute have been <br /> observed in the field - <br /> With reference to comment 4, GR is dependent on the schedule of BP Oil Company's consultant, Cambria <br /> Environmental Technologies, Inc for the reconstruction of wells MW-1 and MW-2 This work must be <br /> completed before GR can initiate the proposed groundwater sampling and pumping activities Their schedule <br /> may delay the implementation of our scope of work beyond the 60 day condition you mention in comment 4 <br /> If you have any questions, please do not hesitate to call me at (925) 551-7555 <br /> Sincerely, <br /> Gettler-Ryan Inc <br /> W Skip McIntosh <br /> Staff Geologist <br /> Enclosure Technical Data 1, RFL 100 Vacuum Pump <br /> f 3 <br /> . cc Mr David J Camille, Tosca Marketing Company <br /> 140205 Oa <br /> 6747 Sierra Court , Suite J • Dublin , California 94568 ( 925 ) 551 -7555 <br />
The URL can be used to link to this page
Your browser does not support the video tag.