Laserfiche WebLink
a p, <br /> ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> Client: <br /> Date: <br /> Alisto Project No: I Field Personnel: IS C., <br /> Service Station No: Address: zl�'�•� <br /> Well ID:A�Jf Field Activity: Well Development-,-Veil Sampling Product Bailing <br /> I <br /> CasiniZ Diameter. PuriZe Method: Well Data: <br /> Inch (016 Gal/foot) ` Pump (dispos. Poly Tubing) Depth to Product <br /> 3 <br /> Inch (0.37 Gal/foot) Disposable Bailers ZLFroduct Thickness <br /> 4 Inch (0.65 Gal/Foot) Other 17Depth to Water <br /> �,.5 Inch (0.83 Gal/foot) 11.66 PVC Standard Bailer <br /> 6 Inch (1.47 Gal/foot) X3.50 PVC Standard Bailer <br /> Sampling Method: Decontamination Method: <br /> Disposable Bailer Triple Rinse (Liqu.inox) <br /> Pump Steam Cleaned <br /> Calculated Pure Volume <br /> �F CSS _ i 711/c� _r�.Z1 ft x f Gal/Ft .1 Z Gal X 3 _ <br /> Total Depth w Depth to r Water Conversion Casing Vol Vols to Total <br /> of Well Water Column Factor Purge Volume <br /> Well DevelogmenttSampling Parameters <br /> Time Temp pH Cond. Purge Comments/ Analysis ContaiPresery <br /> °F (umhos Vol Turbidity Required nom' <br /> /cm) (Gal) Type <br /> r' -7 TPH- VOA HCL <br /> 7! <br /> V r� �. z , G/B= <br /> 'FPH- Amber Solvent <br /> C{ y Diesel Liter Rinsed <br /> �,T r w '-A I <br /> BPA 601 VOA <br /> TOG Amber HSO, <br /> 55IT 2QSF Liter <br /> I <br /> i <br /> FORM:F53l121592 <br />