Laserfiche WebLink
ALISTO ENGINEERING GROUP <br /> Groundwater Development and Sampling Form <br /> Client: 13 G Date:_.. . - <br /> Alisto Project No: 3 /�� �— Field Personneh T) C— <br /> Address:—Station No• Address•_ �� <br /> Well ID• LL6 Field Activity: Well Development Well Sampling _,_Product Bailing <br /> Casing Diameter Pure Method: Well Data: <br /> _V12 - Inch (0.16 Gal/foot) 2/ ump (dispos. Poly Tubing) q Depth to Product <br /> Inch (0.�7 Gal/foot) _Dlsposable Bailers �5 Product Thickness <br /> 4 Inch (0.65 Gal/Foot) _Other /62.2?Depth to Water <br /> �4.5 Inch (0.85 Gal/foot) 1.66 PVC Standard Bailer <br /> �6 Inch (1.47 Gal/foot) 3.50 PVC Standard Bailer <br /> Sampling Method: Decontamination Method: <br /> Disposable Bailer __I/riple Rinse (Liquinox) <br /> Pump Steam Cleaned <br /> Calculated Purge Volume <br /> , 7S _/6_ 7 �< . _ = 13.ozftx Gai/Ft — 210 GalX <br /> Total Depth Depth to Water Conversion Casing Vol Vols to Total <br /> of Well Water Column Factor Purge Volume <br /> Well DevelopmentlSamuling Parameters <br /> Time Temp pH Cond. Purge Comments/ Analysis ContaiPrese <br /> "F (Umhos ValTurbidity Required net <br /> /cm) (Gal) Type <br /> i <br /> TFH- VOAHCl. <br /> G/BTL.X <br /> TPI Amber Solvent <br /> Diesel Liter Rinsed <br /> • � .{�� (�, J EPA 601 <br /> + TOG Amber HSO, <br /> 552OBF Liter <br /> FORM:F53112I592 <br />