My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:21:36 AM
Creation date
1/31/2020 8:45:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ I <br /> 7 <br /> Ms.Vicki McCartney,SJCEHD August 29,2008 <br /> Work Plan for Bench-Scale Test and Injection Well Installation Project No.2046-3250-01 <br /> Parkinson's I-5 ARCO Service Station,Stockton,California <br /> Page 10 <br /> LIMITATIONS <br /> This work plan was prepared in general:accordance with accepted standards of care that existed at <br /> the time this work was performed. No other warranty, expressed or implied, is made. Conclusions <br /> and recommendations are based on field observations and data obtained from this work and <br /> previous investigations. It should be recognized that definition and evaluation of geologic <br /> conditions is a difficult and somewhat inexact science. Judgments leading to conclusions,and <br /> recommendations are generally made with an incomplete knowledge of the subsurface conditions <br /> present. More extensive studies may be performed to reduce uncertainties. This work plan is <br /> solely for the use and information of our client unless otherwise noted. <br /> If you have any questions regarding this project or work plan, please contact Sarah Salcedo at <br /> (530) 313-9966. <br /> Sincerely, <br /> STRATUS ENVIRONMENTAL, INC. <br /> i <br /> 4RflFE <br /> WCGM13 <br /> Sarah O. Salcedo,P.G. owri . Kowtha, P. <br /> Project Manager Principal Engineer 1�vfYo�'\P <br /> Attachments: <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Site Vicinity Map <br /> Figure 4 Historical Depth to Water over Time <br /> Figure 5 GRO and Benzene Concentrations over Time—Wells MW-1 and MW-3 <br /> Figure 6 MTBE Concentrations over Time <br /> Figure 7 TBA Concentrations over Time <br /> Table 1 Well Construction and Soil Boring Details <br /> Table 2 Historical Soil Analytical Results <br /> Table 3 Historical Grab Groundwater Analytical Results <br /> Table 4 Groundwater Elevation and Analytical Data <br /> Table 5 Additional Groundwater Analytical Results <br /> Appendix A Field Practices and Procedures <br /> cc: Mr. Wesley Parkinson <br /> Mr. James Barton, RWQCB-CV <br /> K:\Parkinsons Hammer I-5 Arco\Work Plans\Work Plan for Ozone Bench Scale Test.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.