Laserfiche WebLink
Y _ _ <br /> Ms.Vicki McCartney,SJCEHD August 29,2008 <br /> Work Plan for Bench-Scale Test and Injection Well Installation Project No.2046-3250-01 <br /> Parkinson's I-5 ARCO Service Station,Stockton,California <br /> Page 9 <br /> brom>de, chemical oxygen'demand-(COD), nitrite arid-nitrate, orthophosphate,�and�sulfide-and <br /> sulfate:r�If CrV1 is-generated during bench testing,-Prima`wiU;also:provide information:on the M' <br /> a1-ttenuation of the metal back-to trival nt Cr. If .bromate is--formed-or metals -(other than <br /> chromium),are mobilized`-during-treatment with 03;additional tests will.be.conducted-to•assess <br /> whetherthese.pgkrpeters can naturally-attenuate <br /> Task 3B: Monitoring Protocol <br /> Prior to bench-scale testing,the soil samples-will be analyzed for GRO, BTEX,`MTBE, TBA, <br /> DIPE, ETBE, TAME, acetone, and- (Al, As, Ba; Ca, Cr, Cr , Cu, K, lK Mn';_and Ni).:!. <br /> The-groundwater will be analyzed for-the above chemical constituents'and for ammonia, <br /> nitrogen,..bromate, bromide, COD;-nitrite and nitrate; orthophosphate,.sulfide-and sulfate;-aridV� <br /> total organic carbon(TOC): <br /> p P <br /> The analytical results and observations made during the -bench scale testing will be used to oe <br /> evaluate the effectiveness Of 03 and H2O2 injection and the geochemical changes that may occur <br /> in soil and groundwater due.to injection. - <br /> Task 4: Reporting <br /> Task 4A: Well Installation Report <br /> Stratus will prepare and submit a report to the SJCEHD within. 60 days_following well <br /> installation. The report will document field activities and.will include, but-ndt-be limited to, a <br /> scaled site plan, boring logs, well construction details, tabulated analytical summaries, and a <br /> discussion of results. In addition, the report will document any modifications from the approved <br /> plan. <br /> Task 413: Bench-Scale Test Report and Work Plan for 03 Pilot Test <br /> Stratus will prepare and .submit a report to- SJCEHD that will document the findings of the <br /> bench-scale testing within 60 days. following the completion of the 03 bench-scale testing. <br /> Depending upon the outcome of the test (i.e. if adverse 'effects-heed to be-evaluated for' <br /> attenuation potential), the bench-scale.test could require up to 150-days to complete. The bench <br /> scale test report, at a minimum, will include details on laboratory procedures, tabulated,analytical <br /> results, and a discussion of the results. If appropriate; this report will also propose the <br /> performance of a pilot-scale field test for 03 injection at the site. <br /> z. <br /> K:\Parkinsons Hammer 1-5 Arco\Work Plans\Work Plan for Ozone Bench Scale Test.doc <br />