My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:21:36 AM
Creation date
1/31/2020 8:45:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 2 <br /> HISTORICAL SOIL ANALYTICAL RESULTS <br /> Parkinson's I-5 Hammer ARCO <br /> 3250 West Hammer Lane,Stockton,California <br /> Sample Date TPHG Benzene Toluene Ethyl- Total Xylenes MTBE DIPE ETBE TAME TBA <br /> Sample ID Depth(feet Collected (mg/Kg) (mg/Kg) (mg/Kg) benzene (mg/Kg). (mg/Kg) (mg/Kg) (mg/Kg) (mg/Kg) (mg/Kg) <br /> bgs) (mfg) <br /> Soil Samples Beneath Former Fuel-Dis ensers and Product Poing,and Soil StocApile Samples---January 2000 <br /> D-1 3 1/7/2000 4,450 <2.5 36.8 37.6 332 3.9 <0.20 <0.20 <0.20 <10 <br /> D-2 3 1/7/2000 35.6 0.0092 <0.d 0.0522 0.187 5.49 <0.100 <0.100 <0.100 <10' <br /> D-3 3 1/7/2000 2.37 <0.005 < 005 <0.005 0.355 61.6 <0.400 <0.400 <0.400 <40, <br /> D-4 3 1/7/2000 922 <0.5 25.7 13 94.1 179 <1.00 <1.00 <1.00 <100- <br /> D-5 3 1/7/2000 4.6 <0.005 0.00992 0.00866 0.0872 0.304 <0.100 <0.100 <0.100 <10- <br /> D-6 3 1/7/2000 6.17 <0.005 0.00714 0.0103 0.0416 0.277 <0.100 <0.100 <0.100 <10 <br /> D-7 3 1/7/2000 2.66 <0.005 <0.005 <0.005 <0.005 12.5 <0.100 <0.100 1.02 16.5--- <br /> D-8 3 1/7/2000 122 0.134 0.307 0.914 4.69 14.5 <0.100 <0.100 1.67 <10" <br /> P-1 3 1/7/2000 208 <0.1 <0.1 0.47 10.6 7.91 <0.100 <0.100 <0.100 <10 <br /> P-2 3 1/7/2000 <1.0 <0.005 <0.005 <0.005 0.0801 27.8 <0.100 <0.100 <0.100 <10 <br /> P-3 3 1/7/2000 80.4 <0.05 0.106 0.984 6.09 2.33 <0.100 <0.100 <0.100 <10" <br /> P-4 3 1/7/2000 12.6 <0.005 <0.005 0.00938 . 0.364 18.0 <0.100 <0.100 1.41 10.2 <br /> P-5 3 1/7/2000 4.19 0.0159 0.0139 <0.005 0.594 49.4 <0.100 <0.100 0.756 <10-- <br /> P-6 3 1/7/2000 <1.0 0.0272 0.00822 <0.005 0.0204 "' __3WeT a <0.100 <0.100 <0.100 <10-- <br /> SP-1 1/7/2000 <1.0 <0.005 <0.005 <0.005 <0.005 \<0.100 <0.100 <0.100 <0.100 <10 - <br /> SP-2 1/7/2000 14.7 <0.005 0.0156 0.0184 0.425 <0.100 <0.100 <0.100 <0.100 <10 <br /> SP-3. 1/7/2000 <1.0 <0.005 <0.005 <0.005 <0.005 <0.100 <0.100 <0.100 <0.100 <10-- <br /> SP-4 1/7/2000 <1.0 <0.005 <0.005 <0.005 <0.005 <0.100 <0.100 <0,100 <0.100 <10- <br /> TSP-l"I 1/7/2000 5,620 <2.5 142 64 398 -- - <br /> Over-Excavation Soil Samples---January 2000[1 <br /> D-1@ 10'C 1/26/2000 4,110 8.47 92.8 60.2 313 4.62 . <0.I <0.1 0.191 <10- �\ <br /> D4 @ 10'W - 1/26/2000 <1.0 0.00784 0.0371 <0.005 0.0748 3.3 <0.1 <0.1 <0.1 <10 <br /> D-1 @ 9:Xf 1/26/2000 127 <0.05 0.705 1.55 8.72 0.757 <0.l <0.1 <0.1 <10- <br /> D-1 @ 10'-E 1/26/2000 <1.0 <0.005 0.016 <0.005 0.0652 2.1 <0.1 <0.1 <0.1 <10- <br /> D-3 @ 4.5'C 1/26/2000 1.51 <0.005 0.042 <0.005 0.352 '8.08 <0.1 <0.1 <0.1 <10- <br /> D-5 @ 5'C 1/26/2000 <1.0 <0.005 <0.005 <0.005 <0.005 �<0.1 <0.1 <0.1 <0.1 <10- e <br /> D-8 @ 8'C 1/26/2000 33.8 <0.025 0.21 0.433 2.53 0.746 <0.1 <0.1 <0.1 <10- <br /> D-8 @ 8'SW - 1/26/2000 3.56 <0.005 0.0289 0.0321 0.243 1 1.85 <0.1 <0.1 <0.1 <10- <br /> D-8 @ 8'SE 1/26/2000 2.19 <0.005 <0.005 0.0117 0.0963 :0.664 <0.1 <0.1 <0.1 <10, <br /> D-8 @ 8'NE 1/26/2000 <1.0 <0.005 <0.005 <0.005 <0.005 0.381 <0.l <0.1 <0.1 <10-- <br /> SPO-(1-4)1'1 1/26/2000 728 <0.1 4.19 6.92 38.4 <br /> Direct-Push Soil Borings(GeoProhe)'---August 2000 <br /> GP-1 16 8/16/2000 <1.0 <0.005 <0.005 <0.005 <0.005 <0.1 - - - <br /> GP-1 24 8/16/2000 83,700 <0.05 0.143 0,W4,117 0.221 <0.1 _ - <br /> GP-1 28 8/16/2000 1,110 <0.005 <0.005 <0.005 <0.005 <0.05 <br /> GP-2 16 8/16/2000 <1.0 0.0256 <0.005 <0.005 <0.005 1.62 - - -- <br /> GP-2 20 8/16/2000 3,400 0.14 <0.005 0.179 0.376 2.60F- <br /> GP-2 28 8/16/2000 <1.0 <0.005 <0.005 <0.005 <0.005 <0.05 -- - <br /> Work Plan Addendum REVISED Table 2,Table 3.xls page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.