My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:21:36 AM
Creation date
1/31/2020 8:45:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 2 of <br /> HISTORICAL SOIL ANALYTICAL RESULTS <br /> Parkinson's I-5 Hammer ARCO <br /> 3250 West Hammer Lane,Stockton,California <br /> Sample Date TPHG Benzene Toluene Ethyl- Total Xylenes MTBE DIPE ETBE TAME TBA <br /> Sample ID Depth(feet Collected (mg/Kg) (mg/Kg) (mg/Kg) benzene (mfg) (mg/Kg) (mg/Kg) (mg[Kg) (mg/Kg) (mg/Kg) <br /> bgs) (mfg) - <br /> GP-3 16 8/t5/2000 <1.0 <0.005 <0.005 <0.005 <0.005 2.41 - - -- -- <br /> GP-3 24 8/15/2000 <1.0 <0.005 <0.005 <0.005 <0.005 <0.05 - - -- -- J <br /> GP-4 16 8/15/2000 <1.0 <0.005 <0.005 <0.005 <0.005 0.628 - -- - -- <br /> de <br /> GP-4 28 8/15/2000 <1.0 <0.005 <0.005 <0.005 <0.005 <0.05 - - - <br /> GP-5 • 16 8/16/2000 <1.0 <0.005 <0.005 <0.005 <0.005 <0.05 - - - - <br /> GP-5 30 8/16/2000 <1.0 <0.005 <0.005 <0.005 <0.005 <0.05 - - - ✓ '.% <br /> Groundwater Monitorinz Well Soil Borin s---September 2000 - i <br /> MW-1 15 9/6/2000 4.68 0.152 0.105 0.144 0.447 6.54 - - -- <br /> MW-1 25 9/6/2000 <1.0 <0.005 <0.005 <0.005 <0.005 <0.05 - - - - <br /> MW-2• 15 9/6/2000 <1.0 .; '<0.005 <0.005 <0.005 <0.005 6.41 - - - - <br /> MW-2" 25 9/6/2000 0 <1.0,. 1'J <0.005 <0.005 -0.005 -0.005 "_. <0.05 -- - -- - <br /> MW-3 10 - 9/6/2000 <1.0: <0.005 .<0.005 <0.005 <0,005 1.03 -- - -- -- r <br /> MW-3 15 9/6/2000 <1.0 <0.005 <0.005 <0."005 <0.005 <0.05 - - -- <br /> MW-3 25 9/6/2000 <1.0 -0.005 <0.005 <0.005- <0.005 <0.05 -- <br /> Groundwater Monitorinz Well Soil Borin s and Deeper Assessment Boring---May 2002 <br /> MW-4 15 5/23/2002 <1.0 <0.005 <0.005 <0.005 <0.01 2.0 -0.005 <0.005 0.042 <0.05 <br /> MW-4 20 5/23/2002 <1.0 <0.005 <0.005 <0.005 <0.01 4.5 <0.005 <0.005 0.03 <0.05 <br /> MW4 25 5/23/2002 <1.0 <0.005 <0.005 <0.005 <0.01 0.69 <0.005 <0.005 0.005 <0.05 <br /> MW-5 15 5/23/2002 <1.0 <0.005 <0.005 <0.005 <0.01 0.66 <0.005 <0.005 0.0067 <0.05 <br /> MW-5 20 5/23/2002 <1.0 <0.005 <0.005 <0.005 <0.01 3.50 <0.005 <0.005 0.037 0.78 t. <br /> MW-5 25 5/23/2002 <1.0 <0.005 <0.005 <0.005 <0.01 3.30 <0.005 <0.005 0.03 1.0 <br /> SB-Deep J41 15 5/22/2002 <1.0 0.079 <0.005 0.045 0.01 5.8 <0.005 <0.005 0.074 <0.05 - <br /> SB-Deep 20 5/22/2002 37 <0.05 <0.05 <0.05 <&81<D,i 3.8 -0.05 -0.05 -0.05 <0.5 <br /> SB-Deep 55 5/22/2002 <1.0 <0.005 <0.005 <0.005 <0.01 <0.005 <0.005 <0.005 <0.005 <0.05 <br /> Deep Monitoring Well Soil Boring---Julv 2006 ts/ -0.005 -0.02 -0.02 -0.02 <0.5 <br /> MW-6 15 7/18/2006 <1.0 <0.005 <0.005 <0.005 <0.005 <br /> MW-6 25 7/18/2006 <1.0 <0.005 <0.005 <0.005 <0.005 0.76 <0.02 <0.02 <0.02 1.0 <br /> MW-6 35 7/18/2006 <1.0 <0.005 <0.005 <0.005 <0.005 0.035 -0.02 -0.02 -0.02 <0.5 <br /> MW-6 45 7/18/2006 <1.0 <0.005 <0.005 <0.005 <0.005 0.013 <0.02 <0.02 <0.02 <0.5 <br /> MW-6 54 7/21/2006 <1.0 <0.005 <0.005 <0.005 <0.005 <0.005 <0.02 <0.02 <0.02 <0.5 <br /> MW-6 62 7/21/2006 <1.0 <0.005 <0.005 <0.005 <0.005 <0.005 <0.02 <0.02 <0.02 <0.5 <br /> page 2 of 3 <br /> - Work Plan Addendum REVISED Table 2,Table 3.x1s <br />
The URL can be used to link to this page
Your browser does not support the video tag.