My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002909
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3250
>
3500 - Local Oversight Program
>
PR0545251
>
ARCHIVED REPORTS_XR0002909
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 10:14:55 AM
Creation date
1/31/2020 9:13:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002909
RECORD_ID
PR0545251
PE
3528
FACILITY_ID
FA0001877
FACILITY_NAME
AM PM HAMMER/I5 FOOD #83113
STREET_NUMBER
3250
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
08240009
CURRENT_STATUS
02
SITE_LOCATION
3250 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 Ms Vicki McCartney Project No 880-040 1A <br /> • January 30, 2004 <br /> Page 2 <br /> Remedial activities conducted on January 26, 2000, included removal of approximately <br /> 262 tons of impacted soil in the area below dispenser and product lines Excavation <br /> areas were selected based on the January 7, 2000, sampling results Excavation was <br /> restricted laterally by concrete canopy footings and asphalt surfacing Due to close <br /> proximity of groundwater, the maximum excavation depth was approximately 10 feet <br /> bgs <br /> On August 15 and 16, 2000, five Geoprobeo borings (GP-1 through GP-5) were <br /> completed using a direct push rig The borings were advanced to groundwater, at which <br /> time a discrete water sample was collected Following groundwater sample collection, <br /> the borings were continued to a maximum depth of 30 feet bgs <br /> On September 6, 2000, three groundwater monitoring wells (MW-1 through MW-3) <br /> were installed The well locations were selected based on the Geoprobee investigation <br /> results Well locations are shown on Figure 1 Quarterly groundwater monitoring and <br /> sampling was initiated in September 2000 <br /> On May 22 and 23, 2002, Shaw observed the drilling of one deep soil boring and the <br /> installation of two monitoring wells (MW-4 and MW-5) A dual phase extraction (DPE) <br /> test was conducted from June 10 through 15, 2002 The DPE test was conducted by <br /> simultaneously extracting soil vapor and groundwater from well MW-1 <br /> On September 2 and 3, 2003, Shaw observed the advancement of four CPT borings <br /> Discrete groundwater samples collected from Hydropunch° bonngs advanced adjacent <br /> to the CPT borings indicated the presence of methyl tert-butyl ether (MTBE) in <br /> groundwater downgradient of the site, but the vertical extent of MTBE appears limited <br /> to within approximately 30 feet bgs J <br /> Shaw Environmental, Inc <br /> N 1,;acDP120041Prj1880\8800401 A 4aa doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.