My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:23:37 PM
Creation date
1/31/2020 10:55:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Slate Family Enterprises, Inc. <br /> Project No. F7132.31 COFO <br /> Page 2 J <br /> the joint Taco Bell/Burger King driveway. The well installation procedure will take about three <br /> hours and then the concrete collar needs to set-up overnight. During this "setting-up"period,the <br /> well is protected from traffic with a small barricade or traffic cone. <br /> As shown on Plate 1, the monitoring well in the joint Taco Bell/Burger King driveway will be <br /> located on the west side of the driveway. This driveway is sufficiently wide so that our well <br /> installation operations should not have a significant impact on traffic flow. The other well is to be <br /> located in the parking area and as such could affect your business. Parking lot monitoring wells <br /> are typically located near the head of a parking space on the white line which separates the parking <br /> spaces. While this location requires the use of three parking spaces during installation, it also <br /> allows use of the parking spaces during the setting-up period as well as future access to the well <br /> while the parking spaces are in use. <br /> To minimize the impact on your business, we can schedule our drilling operations to start at 6:00 <br /> or 7:00 a.m. The first well to be installed will be the one located in the parking area. This <br /> scheduling will allow us to be clear of the paiUng area before lunch. As stated before, our <br /> operations in the driveway should not have a significant impact on traffic flow and we should be <br /> finished before dinner. Subsequent operations will involve an initial (one-time) well development <br /> procedure and subsequent quarterly (once every three months) samplings of the groundwater. The <br /> initial development operation will involve one person in a standard van or pickup truck and takes <br /> about two hours per well. This operation can be scheduled around peak business hours. The <br /> quarterly sampling also involves one person in a van or pickup and takes about 1-1/2 hours per <br /> well. As all wells are sampled every quarter(this site presently has five),it will not be difficult to <br /> have the wells on your site sampled around peak business hours. <br /> If this is agreeable with you, please sign and return one original copy of the attached permission <br /> sheet, an additional copy is provided for your records. If you have any questions regarding this <br /> matter,please call me at(510)440-3361. <br /> Sincerely, <br /> RESNA Industries Inc. <br /> Richard A. Gar/low <br /> Senior Project Geologist <br /> RAG/sr <br /> Enclosures <br /> cc: Mr. Steven K. Schneider, San Joaquin County Public Health Services <br /> Mr. Jack Griffith, Quik Stop Markets <br />
The URL can be used to link to this page
Your browser does not support the video tag.