My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:23:37 PM
Creation date
1/31/2020 10:55:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ovr:lrznen 1b:02 925-463-2559 RTC PLEASANTON .I PAGE 04 j <br /> STAFF DRAFT mtbe public STAFF DRAFT <br /> 121x3/99 <br /> c) If necessary,require development and implementation of remedial action plan within <br /> three years. I <br /> II <br /> i` <br /> Priority Class (A, B, or C) I <br /> I <br /> Distance to drinking Maximum MTBE concentration in groundwater(ppb): <br /> water weR(ft) 5-500 500-5,000 5,000-50,000 over 50,000 <br /> 0-1000 B A A A !'+ <br /> 1000-2500 C B A A <br /> 2500-5000 C C B A <br /> over 5000 C C C B 6 <br /> f <br /> Step 3. Interim Remedial Action <br /> Sites with high concentrations and a large release mass should have those concentrations and <br /> mass reduced before the plume can spread regardless of their response category. For example, <br /> sites with free product orstern concentrations over 10 000 ppb MTBE in the groundwater <br /> are candidates for source area remeppn as an interim remedial acroLong-tem impacts to <br /> water quality and financial resources are likely to be reduced if interim remediation is performed <br /> in these situations. Conversely,if the investigation data indicate a low potential threat,either <br /> because the mass of MTBE released is small,migration to drinking water wells is highly / <br /> unlikely,or other relevant factors exist,then this interim remedial will not be necessary. J/ <br /> Step 4. Site Characterizationanvestigation <br /> If the conceptual model has data gaps that may affect decisions made at the site,fin Ither <br /> investigation may be warranted. Geologic data that has already been collected from nearby sites <br /> can provide an overview of what conditions may be encountered beneath the site. ;This regional <br /> information combined with the data gathered in the scoping phase allows the regulator to choose <br /> a level of effort for the investigation of the site.This is a very important step because all sites do l <br /> not require the same detail.High-risk plumes may need a more detailed level of assessment that <br /> inc u es pth-discrete sampling to determine the plumes three-dimensional profile and to target <br /> remediation so that it is most effective. <br /> An uninterrupted vertical profile of the stratigraphy by continuous core or cone penetrometcLcw. <br /> help verify if the regional,conceptual model of the geology applies to this site. if the conceptual <br /> model using regional data implies that persistent downward verticat&roundwater gradients may <br /> exist,these gradients and the vertical errtent of MTBE impacts should be investigated using <br /> cluster yells or other methods. ee co, nvis also true;sites located in areas with'known IP <br /> upward gradient may not require site specific assessment of vertical migration. <br /> It is extremely important for the agency providing cleanup oversight and the tank permitting <br /> agency to work together to identify the source of the MTBE in the subsurface(tank,pipe joint, <br /> STAFF DRAFT S'T'AFF DRAYr Page 8 of T8 <br /> I <br /> k <br /> i <br /> e <br />
The URL can be used to link to this page
Your browser does not support the video tag.