Laserfiche WebLink
i <br /> i. <br /> V% <br /> 7 <br /> i <br /> (i.e.,the north end of the pump island). ATC proposes to advance two(2)soil borings(designated SB-4 <br /> and SB-5)to an approximate depth of approximately 15 feet bgs One soil,sample will be collected from I j <br /> each of the two proposed borings at the capillary fringe, and one groundwater sample will be collected <br /> from each boring at approximately 15 feet bgs. Borings SB-4 and SB-5 will then be advanced to 40 feet <br /> bgs, and groundwater samples will be collected from the bottoms of those borings using Hydropunch 4 <br /> techniques. One(1)additional boring(SB-6)will be continuous) 'cored to a depth of a <br /> y p pproximately 40 feet <br /> bgs; a soil sample will be collected at the capillary fringe from this boring. Depth discrete groundwater <br /> samples will also be collected from the shallow zone(from approximately 15 feet bgs)and the deep zone <br /> (from approximately 40 feet bgs) at boring SB-6. <br /> f <br /> The anticipated scope of work is as follows. (- <br /> SCOPE OF WORK �I [ <br /> t f <br /> Task 1 Pre-field Activities/HASP "-ll <br /> This task includes all the activities related to !pre-mobilization, permits, site clearance and site specific <br /> Health and Safety Plan (HASP) preparation. The drilling permit will be obtained from SJCEHD. A work <br /> plan is also required for submittal with the drilling permit application. The borehole locations will be <br /> marked with white paint and Underground Service Alert(USA)will be notified at least 48 hours prior to <br /> initiating drilling activities to allowtime for utility companies to identify underground lines,pipes,or cables f <br /> that maybe affected by the drilling activities. A private utility locator will also be retained to ensure that the <br /> proposed locations do not conflict with underground utility locations. A HASP will be prepared for the <br /> subject site investigation based on requirements of Title 29 of the Code of Federal Regulations (CFR) <br /> Section 1920.1200),the California General Industry Safety Order(GISO)and Title 8, California Code of <br /> Regulations (CCR) Section 5192. A copy of;the HASP will be 'on-site during the course of the field <br /> activities. <br /> i <br /> Task 2 Drilling/Soil and Groundwater Sampling/Sample Analysis <br /> 9! <br /> ATC will utilize hand-auger techniques to clearthe proposed boring locations to approximately 5feet bgs. <br /> All drilling and sampling activities will be performed consistent with ATC's standard operating procedures <br /> (Attachment 1). <br /> The locations of the proposed borings are illustrated on Figure 1,Proposed Boring Location Map.The soil <br /> borings will be drilled using a track-mounted,direct push(Geoprobe)drilling rig. Drilling will be conducted <br /> by a California C57-licensed drilling company.:An ATC field scientist, under the responsible charge of a <br /> California registered professional engineer or geologist,will log tfi'e borings and collect soil samples. ATC <br /> proposes to advance three soil borings (SB-4,1•.SB-5 and SB-6) af�the locations presented in Figure 1. <br /> Ai <br /> During drilling of borings B-4 and B-5,an approximately 1.5-inch diameter boreholewill be advanced and <br /> logged to an approximate depth of 15 feet bgs (approximately'2 to 3 feet below first encountered <br /> groundwater). Soil samples will be collected just above the water table(i.e.,at approximately 10 feet bgs) <br /> or where elevated PID readings indicate the presence of impact. A shallow zone groundwater sample will <br /> vAdditional Investigation Workplan } <br /> n Quik Stop No.132,Stockton,CA <br /> i May 18,2009 <br />