Laserfiche WebLink
Workp6KFor Additional Assessment and Feasibmey Study <br /> Quik Stop Market No. 132 <br /> 3555 West Hammer Lane <br /> Stockton, California <br /> • The fuel oxygenates tert-butanol (TBA), MTBE, di-isopropyl ether (RIPE), ethyl-tert-butyl <br /> ether (ETBE), and tert-amyl methyl ether (TAME), and 1,2 dichloroethane (1,2 DCA) <br /> using EPA Method 8260 <br /> TASK 2 WELL INSTALLATION <br /> A down gradient two-well cluster of groundwater monitoring wells (one upper aquifer well and <br /> one lower aquifer well) will be installed to the east of Boring SB3, at the site of the eastern most <br /> boring described in Task 2. The location will be cleared prior to drilling by marking the location <br /> with paint and notifying USA. A well permit will be obtained from the PHS/EHD. <br /> The soil borings for the wells will be advanced with a drill rig equipped with hollow stem augers <br /> to depths of approximately 15 and 30 feet bgs for the upper aquifer well and lower aquifer well, <br /> respectively. We assume that adverse drilling conditions, such as cobbles or flowing sands, will <br /> not be encountered. <br /> The groundwater monitoring wells will be completed first using 2-inch diameter, Schedule- 40 <br /> PVC casing. The upper aquifer well will be set with a 10-foot section of 0.020-inch slotted <br /> screen set at 5 to 15 feet bgs with 5 feet of Schedule 40 PVC blank to the surface. Sand pack <br /> material consisting of 2/20 Monterey sand, or equivalent, will be installed from 15 to 3 feet. <br /> Bentonite Pellets will be placed from 3 to 2 feet bgs. Neat Cement Grout will then be placed from <br /> 2 feet to 1-foot bgs, and concrete will be placed to the surface. The well will be secured at the <br /> surface with a flush-mounted, traffic-rated well box. After the sand pack has been placed, the <br /> well will be surged to set the sand pack and partially develop the well. _ <br /> The lower aquifer groundwater monitoring well will be completed to a depth of approximately 30 <br /> feet bgs. The lower aquifer well will be set with a 10-foot section of 0.020-inch slotted screen set <br /> at 20 to 30 feet bgs with 20 feet of Schedule 40 PVC blank to the surface. Sand pack material <br /> consisting of 2/20 Monterey sand, or equivalent, will be installed from 30 to 18 feet. Bentonite <br /> Pellets will be placed from 18 to 15 feet bgs. Neat Cement Grout will then be placed from 15 feet <br /> to 1-foot bgs, and concrete will be placed to the surface. The well will be secured at the surface <br /> with a flush-mounted, traffic-rated well box. After the sand pack has been placed, the well will be <br /> surged to set the sand pack and partially develop the well. <br /> 4 <br />