Laserfiche WebLink
Work Plan For Plume Evaluation <br /> f Quik Stop Market No. 132 <br /> �7 3555 West Hammer Lane <br /> Stockton, California <br /> include: UST evaluation procedures, assessment procedures, a soil boring location.map, soil <br /> boring logs, a tabulated summary of analytical results, laboratory data sheets and chain of custody <br /> documentation, evaluation of the data collected, well search results, cross sections, conclusions, <br /> and recommendations. <br /> SCHEDULE <br /> Following approval of this Work Plan by the San Joaquin County Public Health Services <br /> Environmental Health Division, we expect mobilization for the field work will require <br /> approximately 4 weeks. The summary report will be submitted within 6 weeks of the start of the <br /> fieldwork. <br /> On behalf of Quik Stop Markets, Inc., ATC Associates Inc. appreciates your involvement with <br /> this project. If you have any questions regarding this Work Plan, please feel free to contact Jim <br /> Lehrman at your convenience at (925) 460-5300. <br /> Sincerely, <br /> ATC ASSOCIATES INC. <br /> James A. Lehrman, RG, CHG <br /> Program Manager, Subsurface/Remediation <br /> C <br /> Attachments: Figure 1. Site Location Map <br /> 1 Figure 2. Site Plan <br /> cc: Michael Karvelot, Quik Stop Markets, Inc. <br /> 1.W Pm®mtQU1KSf MS 132(M3)U MRTS2MWORKPLAN(X-sella d Tuck testXR)Ad <br /> 7 <br />