My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012711
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
ARCHIVED REPORTS_XR0012711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 12:21:26 PM
Creation date
1/31/2020 11:25:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012711
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quik Stop Markets November 1, 1990 <br /> Project No. 349132-31 <br /> Page 4 <br /> 'S <br /> -^• 6. SITE-SPECIFIC SAFETY REQUIREMENTS <br /> Safety requirements specific to the 3555 W. Hammer Lane site include the following: <br /> . i Potential Hazaral <br /> Protective Measure <br /> Residual gasoline fuel and Level D protective clothing will be worn. <br /> vapors from removed tanks Respiratory protective devices with organic vapor <br /> cartridges will be kept readily available. <br /> Flammability of vapors All pumps, hoses, nozzles, couplings, etc. will be <br /> made of nonsparking materials. An organic <br /> --� vapor/explosive <br /> meter will be used to continuously monitor the <br /> t immediate work area for the level of organic vapors <br /> present. F <br /> Loud equipment noises <br /> Proper hearing protection is required. ; <br /> t <br /> Vet and slippery surfaces No-slip soled boots for oil and grease are required. <br /> 1 � <br /> } - Heavy equipment operations All personnel will wear hard hats and stay clear of <br /> 77 j movable equipment parts. <br /> Open excavations and cave-ins Personnel will be required to stay at least 2 feet <br /> from <br /> edges of open excavations. Under no circumstances <br /> shall a person enter an excavation over 4 feet deep <br /> Y l without following proper Occupational Safety and <br /> Health Administration(OSHA)requirements. <br /> Working with basic Common sense will be practiced. Special clothing <br /> construction tools g <br /> `I required during operation of specific equipment will <br /> be worn. <br /> 7. DECONTAMINATION AND WORK ZONES - <br /> All equipment will be decontaminated prior to arrival on-site using a pressure washer. <br /> The exact location <br /> �. will depend on conditions at the time of decontamination. ' <br /> 4 f f <br /> � P <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.