Laserfiche WebLink
s <br /> Vms <br /> g <br /> Northern California Regional Office 41674 Christy Street,Fremont,CA 94538-3114 (415)6590404 Fax:(415)651.4677 Lic.#596545 <br /> ! <br /> I <br /> } <br /> I F� <br /> i <br /> i November 7, 1990XCOLTIECH <br /> i <br /> San Joaquin County Public Health Services <br /> ! Environmental Health Division <br /> i 445 North San Joaquin Street �T ViGi ` <br /> Stockton, CA 95202-2028 <br /> i Attention: Mr. Steven K. Schneider <br /> Subject: Addendum B, Phase II Work Plan Groundwater I <br /> Duik Ston #132 ate Investigation <br /> �Y _ <br /> 3555 West Hammer Lane, Stockton, California <br /> :F Exceltech Project No. 3-49132-41 <br /> Dear:Mr. Schneider: <br /> Enclosed is Addendum B to Phase li Work Plan for the Quik Stop Market#132 for the <br /> r <br /> site referenced above. The original Phase II Work Plan, Health and Site.Safety Pian were <br /> dated August 28, 1990. Per your verbal approval of November 6th there will be no <br /> additional Health and Site Safety Plan submitted with Addendum B. All work under I <br /> Addendum B will follow sampling, soil handling,and safetyrotocol as detailed in our <br /> original work plan. p <br /> The following work plan does include: <br /> • the maximum excavation which will be performed ; <br /> • the minimum sampling which wil; be performed 4. <br /> • a drawing of the work is be performed E <br /> If you have any questions,please call. <br /> r y ii Yours trulyr # <br /> amen D. Rtbfn <br /> Program Manager <br /> r - r- <br /> r JDR:jyd <br /> Enclosure <br /> _ cc: -Mr. Richard A. Garlow, Erxceltech, Inc. <br /> r Mr. Jack Griffith, Quik Stop Markets, Inc. ; <br /> v n! Recyclable and made from recycled paper. <br /> Ci y a <br />