Laserfiche WebLink
t <br /> ProjectName: -4 .?2- Project Number. . 62<a� <br /> Address: Lg Date: _ <br /> r-9-roo 0 C4 Well Lock Number. <br /> Wel(Number. JJW q Well Integrity- <br /> Development/Purge/Sampler(s): Ambient Conditions: <br /> ' Pre-Purge DO (mg/L) <br /> Screened at WELL VOLUME CALCULATION <br /> Well Casing Total Well depth to Linear Feet Gallons Per <br /> mer_art.4.. Death ftt-1, __ Ccou`ndwater fGtM of GVH LJneaE Foot _. _-,�Well Volume faal-1 <br /> g Z<, � {���� a �S X 0.17 <br /> a a -� X 0.38 = <br /> 4 - = X 0.56 = <br /> 4.5 - X 0.83 = <br /> 6 X 1.5 = <br /> GROUNDWATER SURFACE INSPECTION BAILER CHECK) <br /> Floating Product (ft-) (in.): SheeMridescence: Odor: U <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑Stainless Steel Bailer; Submersible Pump;, Air Diaphragm Pump; ❑ Honda Pump;❑Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. ColoriTurbidity <br /> Purged (gal.) Time pH (pslumhos) (other) <br /> 0 0 LOW "1-58 ZZ•3 a A 9, Recovery <br /> 1 3 ) Z2.(D Rate: <br /> 2 U� _4D 7,2.t. <br /> 3 /64s �. 2Z Fast <br /> 4 2 /64 '1.-� OZ.S Medium <br /> 5 <br /> Slow <br /> 6 ' <br /> 17 <br /> 8 <br /> iQ <br /> GROUNDWATER SAMPLING Sampling Equipment: <br /> _Water Level_Recovery Sample Containers <br /> Depth to GW(ft_) No. Preservation Method/pH <br /> (1) Initially G aD 1 liter(,),'amber glass <br /> (P) After Purging - . :9 40 mf VOA <br /> P - 0.8 (P-1) = 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling 8.00 Trip Blank <br /> (P-S)/(P-1) X 100 = _W % Total Recovery <br /> Sample DatelTime: 2. 1 A Turbidity (NTU): <br /> Calibrate Da#eMme: EH (NtEv): �Z7 <br /> PURGED WATER CONTAINMENT <br /> Total drums at site: Water Sail Water pump through treatment system <br /> Remarks: <br /> U10.11r"Ev'.NICD 0'1'Sam 11,19 7i v'_d— <br />