Laserfiche WebLink
VKUUN <br /> 32 Project Number: S. 62a <br /> Project Name: `] <br /> Address. 355Date: <br /> C,10-T.0% PA <br /> Well Lode Number. <br /> Well Number. Well Integrity: <br /> Development/Purge/Sampler(s): Ambient Conditions: u <br /> Pre-Purge DO (mg/L) <br /> Screened at WELL VOLUME CALCULATION <br /> Well Casing Total Waif Depth to Linear Feet Gallons Per <br /> 2L4alder fln.f Depth(ff.) Goundwaterr(GWI of GW Linear Foot 1 Weftyolume_(01-1 <br /> �/ <br /> 3 W'S-Z D-65 X 0.38 }- <br /> ` 4 - = X 0.66 = <br /> 4.5 - X 0.83 A <br /> i� 6 = X 1.5 s <br /> GRQUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft.) (in.): -&- Sheen/iridescence: , P% Odor. N� <br /> ' GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer, ❑ Submersible Pump;*�Air Diaphragm Pump; ❑ Honda Pump; ❑Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Coior/Turbidity <br /> Purged (gal.) Time pH (ps/umhos) C) (other) <br /> 0 0 I-- 146 gm — Recovery <br /> Rate: - < <br /> 2 b SZ 1.sq q 11 2 0ast _ <br /> 3 (a 1t)53 � 3 Z4.1 <br /> Medium <br /> 4 � oS "7•2'� 25.6 <br /> 5 Slow <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment: <br /> _Water Level Recovery Sample Containers <br /> Depth to GW(ft.) No. Preservation Method/pH <br /> (1) Initially5 1 liter(L),"amber glass <br /> (P) After Purging 40 ml VOA GI Z <br /> P - 0.8 (P-1) = 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling lb•! Trip Blank <br /> (P-S)/ (P-1) X 100 = to % Total Recovery <br /> Sample Date/Time: Turbidity (NTU): <br /> Calibrate DatelTime: �v ��1 06 EH (MEV): ] � <br /> PURGED WATER CONTAINMENT <br /> Total drums at site: Water Soil Water pump through treatment sy5tern <br /> Remarks: IC1*J 'TN �i�/ �►� <br /> - <br /> �h <br />