Laserfiche WebLink
�rtvui�urrr► arc vmJ1,4W VVGLL rUMkJM1QHMt'LJN(-i VVUKR �1'1CL7 <br /> Project Name: ti Project Number: S. 62S-e5to <br /> Address: 355. Date: <br /> G o Well Lock Number. <br /> Well Number) Well Integrity: <br /> DevelopmentlPurge/Sampler(s): Ambient Conditions- <br /> Pre-Purge <br /> onditionsPre-Purge DO (mg/L) <br /> screened at WELL VOLUME CALCULATION <br /> Well casing Total Well Depth to Linear Feet Gallons per <br /> Diameter fin.) Depth M-1 ggund�w}ater IGSM of GWS+ Linear Foot I Wen volume(gal] <br /> X 0.17 <br /> y 3 ?�.I1 - 1� jZ_l] 1 X 0.38 <br /> 4 - X 0.66 = <br /> X 0.83 a <br /> $ - _ x 1.5 <br /> GROUNDWATER SURFACE INSPECTION (BAILER CHECK) <br /> Floating Product (ft.) (in.): SheenAddescence: Odor: <br /> GROUNDWATER PURGING PURGE METHOD <br /> ❑ Stainless Steel Bailer, ❑ Submersible Pump;AAir Diaphragm Pump; ❑ Honda Pump;❑Other <br /> Stagnant Volume <br /> Volumes Purged Conductivity Temp. Colorfrurbidity <br /> Purged (gal.) Time PH (ps/umhos) C) (other) <br /> 0 0 040 <br /> 1 " .� �1� ? of r'�cre 27113Recovery <br /> 2 r 29.01 )-" <br /> Rata: <br /> 3 Medium <br /> 4 )O [� Ct2_ri 22. 3 Slow <br /> 5 <br /> 6 <br /> T <br /> 8 <br /> 10 <br /> GROUNDWATER SAMPLING Sampling Equipment: <br /> Water Leve!_RecoverY Samote Containers <br /> Depth to GW(€t.) No. Preservation Method/pH <br /> (1) Initially �n,, 4 -7-CW 1 liter(L),-amber glass <br /> (P) After Purging bo 40 mi VOA <br /> P - 0.8 (P-1) = • ' 80% Recovery 500 ml polypropylene <br /> (S) Before Sampling _I Trip Slank <br /> (P-S)/ (P-!) X 100 = M % Total Recovery <br /> Sample DateMme: 6'2K-- j isp, Turbidity (NTU): g_ <br /> Calibrate Date/Time: -2T ( lQ�3� _ EH (Ni EV): c <br /> PURGED WATER CONTAINMENT <br /> Total drums at site: Water Soil Water pump through treatment system <br /> Remarks: <br /> F_A rJ\I I�L�.•�iRC ti'l'a-Riunplil,g-Tyg:.SOi <br />