My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002902
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
3500 - Local Oversight Program
>
PR0545252
>
ARCHIVED REPORTS_XR0002902
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 3:26:41 PM
Creation date
1/31/2020 1:58:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002902
RECORD_ID
PR0545252
PE
3528
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
02
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
permanent conductor casing placed adjacent to the contaminated aquifer and <br /> pressed or advanced slightly into the underlying aquitard. The cased hole will <br /> be cleaned as necessary, following which, a smaller diameter drill bit/auger <br /> will be advanced to the next underlying water bearing stratum. An <br /> ' impermeable seal will be placed in the borehole or annular space as <br /> appropriate upon completion of exploratory boring/well construction. <br /> ,I II. SOIL SAMPLING BY HAND <br /> ' 1) Some situations require that samples be collected by hand without the <br /> assistance of a drill rig (e.g., soil stock piles, excavation sidewall sampling, <br /> etc.). When possible, soil samples will be collected using a steel core sampler <br /> ' equipped with clean brass liners which is advanced into the soil with a slide <br /> hammer. In other cases, the outer surface of the soil is removed and a brass <br /> liner is driven into the soil by hand or with a hammer. To avoid damaging <br /> 1 the liner, a block of wood can be held next to the liner so that the hammer <br /> strikes the block rather than the liner. The liner is removed and handled as <br /> ' described above. In deep excavations where safety factors preclude the direct <br /> sampling of the bottom or side wall, soil is retrieved by a backhoe bucket and <br /> this soil is sampled. <br /> ' RESNA INDUSTRIES, INC. <br /> Soil Sampling Protocol <br /> Latest Revision: October 23, 1991 <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.