Laserfiche WebLink
ii.nisi7b 1�:11 latus1kHItli1t5 + 12094640138 D03 <br /> m <br /> Work Plan for Well Destruction-Former Chevron Service Station N9-1918 <br /> November 8, 1996 <br /> performed by a California-licensed well driller. G-R Field Methods and procedures <br /> are attached. <br /> j <br /> Task 3. Reporting j <br /> i <br /> Following receipt and analysis of all data, a letter report will be prepared which <br /> summarizes the well destruction activities. This report will be submitted to Chevron <br /> for their use and distribution. <br /> i <br /> PROJECT STAFF <br /> Mr. Stephen J. Carter, a Registered Geologist in the State of California (R.G. No. 5577), <br /> will provide technical oversight and review of the work. Mr. Greg Gurss, Project Manager, <br /> will supervise implementation of field and office operations. GSI employs a staff of <br /> geologists, engineers, and technicians who will assist with the project. <br /> SCHEDULE <br /> Implementation of the proposed scope of work will commence upon receipt of regulatory <br /> approval. <br /> If you have any questions.regarding this Work Plan, please call us in our Sacramento office <br /> at (916) 631-1300. <br /> Sincerely, <br /> Gettler•Ryan Inc. . <br /> T d A. Del Frate <br /> Staff Geologist <br /> �/arr * No.5W <br /> Step' hen T, q k <br /> Senior Geologist9 Qac <br /> R.G. 5577 OF Cptl <br /> Attachments: Figure 1. Vicinity Map <br /> Figure 2. Site Plan <br /> Field.Methods and Procedures <br /> Boring Logs and Well Construction Details <br /> i <br /> 6349.01-1 2 <br /> 6 <br /> i <br />