Laserfiche WebLink
45 East Harding <br /> Page 2 <br /> I <br /> 8. The report failed to include well construction details, for wells other than f <br /> those depicted on the cross-section, and an explanation of how well <br /> construction may have influenced groundwater sample results. <br /> 9. The report failed to include the laboratory report and sampling field <br /> notes from the last sampling event. <br /> Please prepare a revised closure summary report. The next due date for <br /> } <br /> consideration of your closure request by the Technical Review Committee is <br /> December 19, 1996. PHS/EHD strongly suggests that another single copy be <br /> submitted prior to the submittal of the 10 copies necessary for distribution to the <br /> Technical Review Committee. <br /> If you have any questions, do not hesitate to contact me at (209) 468-0337. <br /> I <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Mary Meays, Senior REHS Margawt Lagorio, REHS <br /> Site Mitigation Unit Supervisor <br /> I <br /> I <br /> MM\45HARD <br /> cc: Elizabeth Thayer, CVRWQCB <br />