My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 6:04:48 PM
Creation date
1/31/2020 2:30:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{I i <br /> i -2- <br /> 10 . These Basin Plan amendments do not become effective until <br /> ii approved. by--the SWRCB and until regulatory provisions are ij <br /> approved by the Office of Administrative Law (OAL) <br /> I <br /> THEREFORE BE IT RESOLVED THAT: <br /> The SWRCB : <br /> 1 . Approves the Basin Plan amendment adopted by the ` <br /> San Francisco Bay RWQCB under Resolution No. 94-101 on <br /> ![ August 17, 1994 with the exception of : <br /> a <br /> li a. Page 12 second bulleted paragraph, second sentence;; and , <br /> ib . . The section titled "Non-Attainment of Ground Water Cleanup <br /> Levels" (page 19 - ' 21) . a <br /> 2 . Holds consideration of items l . a. and l.b. , above, in <br /> abeyance pending SWRCB consideration of the need for a <br /> statewide ground water cleanup policy. <br /> 3 . Directs the SWRCB Executive Director to work with the RWQCB <br /> Executive Officers to develop a statewide policy on ground p <br /> water and soil cleanup, for SWRCB review. It is the SWRCB' s <br /> isdesire to have the matter brought forward for review and <br /> consideration within 120 days . The SWRCB requests the <br /> Executive Director to report at each SWRCB workshop in the <br /> interim on the progress toward development of the policy. <br /> 4 . Authorizes staff to forward the regulatory provisions of the, <br /> approved amendments to OAL. <br /> 3 I <br /> ii CERTIFICATION <br /> If <br /> The undersigned, Administrative Assistant to the SWRCB, does s <br /> hereby certify that the. foregoing is a full, true, and correct <br /> copy of a resolution duly and regularly adopted at a meeting of <br /> the State Water Resources Control Board held on <br /> December 13 , 1994 . <br /> li au een Marche <br /> Administrative Ass ' stant to the Board <br /> '' tJ <br /> Ii *I <br /> 1 Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.