My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
45
>
3500 - Local Oversight Program
>
PR0545259
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 6:04:48 PM
Creation date
1/31/2020 2:30:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545259
PE
3528
FACILITY_ID
FA0004966
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
45
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
12707037
CURRENT_STATUS
02
SITE_LOCATION
45 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' F - 4 4 ' O i ) Eau i P m e n z Ser <br /> 3 - 95 M O N `- - - <br /> OIL EQUIPMENT SERVICE STATE LICENS1No,3TJu7 <br /> c"NSIFICATIQNc A-NAt.,Ci1D40 <br /> Derision of Keith A. TaWu,Inc. aTATicmviaoKmENTAL ASAVASOUNo.111751 <br /> _ a <br /> } Tsbphone: POO 764-18M <br /> Foe PA 754.6720 <br /> i Pao ofte Box No <br /> 7601nduv14a1 Way <br /> BAN ANDREAS.CAUFORN1405240 <br /> July 3F 1995 <br /> Chevron U.S.A. Products Company <br /> P.O. Box 5004 <br /> San Ramon, CA 94583-0804 <br /> I <br /> ATTN: Brett Hunter s <br /> SUBJECT: SSN 1918 - Stockton, CA <br /> 1988 Demolition <br /> Dear Brett, <br /> This is in response to a telephone request we received <br /> from Craig Vickery on June 300 1995, concerning the backfilling <br /> and compaction we did at Subject Site. <br /> Considerable over , excavation was done in the tank hole <br /> area at this site in an attempt to remove all of the contaminant <br /> compacted material. It was eventually determined that the <br /> dontaminants had migrated beyond the limits of safe and feasible <br /> fiver excavation. At this point we were advised to back fill <br /> Che hole with the Soils .that had been removed. <br /> The soil was placed in the hole in approximate 12" Lifts <br /> knd compacted with a vibratory, rifle on, sheeps foot compactor. <br /> The imported material used to replace the volume the tanks <br /> 1 had occupied was pea ,gravel up. to approximately 24" from surface, <br /> with the top layer-being compacted 3/4" AB road .base gravel . <br /> Please advise if you need any further information relative <br /> to this project. <br /> ! Sincerely, <br /> Aeith ; <br /> lli , res ent <br /> cc: J87-530 file <br /> I <br /> a _ - <br />
The URL can be used to link to this page
Your browser does not support the video tag.