Laserfiche WebLink
CONTENTS <br /> Pa <br /> 1 <br /> 1. INTRODUCTION <br /> 1 <br /> 1.1 Location and Site Setting I <br /> 1.2 Site Description <br /> 2. PREVIOUS INVESTIGATIONS 2 <br /> 2.1 SVGA,18 November 1987 2 <br /> 2.2 Tank Removal and Soil Sampling,24 February 1988 2 <br /> 2.3 Installation and Sampling of Six Groundwater Monitoring Wells, 2 <br /> 7-15 November 1988 3 <br /> 2.4 Removal of Storage Tanks <br /> 2.5 Installation and Sampling of Two Groundwater and Five Vadose 3 <br /> Monitoring Wells,23 January-7 February 3 <br /> 2.6 Soil Vapor Extraction and Permeability Testing,24 April 1989 4 <br /> 2.7 Soil Remediation 4 <br /> 2.8 Quarterly Groundwater Sampling and Analysis <br /> 3. GROUNDWATER ASSESSMENT 5 <br /> 5 <br /> 3.1 Site and Local Hydrogeology 6 <br /> 3.2 Groundwater Chemistry <br /> 7 <br /> 4. WORK PLAN <br /> 4.1 Drilling and Well Installation 7 <br /> 7 <br /> 4.2 Soil Sampling <br /> 4.3 Groundwater Monitoring Well Installation,Development, 8 <br /> and Sampling <br /> 9 <br /> S. REPORTING <br /> n 10 <br /> 6. SCHEDULE <br /> 11 <br /> 7. REFERENCES <br /> APPENDIX A: Protocols for Well Drilling,Completion,Develooment,and Sampling <br /> APPENDIX B: Field Notes <br /> APPENDIX C: Soil Boring Logs <br />