Laserfiche WebLink
deposits are approximately 3,000 feet thick and generally consist of alluvial gravel, sand, silt, <br /> and clay Groundwater to these alluvial deposits is unconfined to semi-confined (GTI, March <br /> 1994) <br /> Groundwater in the Stockton area is primarily affected by significant groundwater extraction <br /> for irrigation and public water supply and by the canals and waterways of the Stockton <br /> Harbor Regional groundwater flow in the vicinity of the site has historically been toward the <br /> northeast This flow direction is the result of groundwater extraction which has reduced <br /> groundwater elevations in Stockton to approximately-30 to -40 feet mean sea level <br /> Subsurface investigation indicates that the site is underlain by interbedded clayey silts, silty <br /> clays with lenses of sands to the total depth explored (70 feet bgs) Historically, depth to <br /> groundwater has ranged from 35 36 feet bgs (Well MW-8, February 7, 1989) to 58 01 feet <br /> bgs (Well MW-10, October 26, 1992) Quarterly groundwater monitoring data from <br /> November 1988 to present indicate that groundwater beneath the site consistently flows in a <br /> northeasterly direction at an approximate gradient of 0 002 to 0 003 foot per foot <br /> 2.4 Interim Remediation <br /> SVE operational data indicate that approximately 12,000 pounds of hydrocarbons were <br /> removed by the SVE system The factors utilized to calculate pounds removed are the influ- <br /> ent concentrations, the density of gasoline, the flow rate, and the operating time are presented <br /> as Appendtx C <br /> The calculations for determining TPPH-g mass in soil and groundwater utilized soil boring <br /> and analytical data to estimate the areal extent of the plume Average concentrations were <br /> applied to distinct cross sectional areas in order to arrive at the total TPPH-g mass both prior <br /> to and after SVE treatment These calculations are also presented as Appendix D <br /> Site remediation to date has consisted of removing product storage and distribution equip- <br /> ment, site assessment activities, groundwater monitoring, and installation and operation of an <br /> SVE system The SVE system operated from November 1990 to November 1992, with a <br /> 7-month hiatus from February to September 1992 The wells used for vapor-phase hydrocar- <br /> bon removal were SVE Wells V-1 through V-5, and Monitoring Wells MW-3 through MW-6 <br /> The vacuum radius of influence was estimated to be in excess of 25 feet for SVE Wells V-1 <br /> through V-5 (EA, May 12, 1989) A subsequent vacuum radius of influence analysis was <br /> conducted using Well MW-4, the estimated effective radius was 112 feet (EA, March 25, <br /> 1991) <br /> Based on data collected from borings drilled before and after the SVE system was activated, <br /> hydrocarbon concentrations in soil and groundwater were significantly reduced as a result of <br /> SVE system operations Soil chemistry data from borings indicate that TPPH-g mass in the <br /> 3201337B/CAP—AMD DOC 6 November 30, 1995 <br />