Laserfiche WebLink
• <br /> Mike Infurna [EH] <br /> From: Sandra.Shearer@CH2M.com <br /> Sent: Wednesday, October 17, 2007 5:18 PM <br /> To: Mike Infurna [EH] <br /> Cc: bcrawford@spectrumexploration.com; robert.pexton@ch2m.com <br /> Subject: RE: Koppel KP-11S <br /> Attachments: WellKP-11S-DestPermit.pdf; KP-11S_DestructionPermit_Receipt.pdf <br /> Wel I KP-11 S-DestPerKP-11 S_Destruction <br /> mit.pdf(486... Permit_Recei... <br /> Hi, Mike, <br /> Attached is the application for destruction of Monitoring Well KP-11S at the Koppel <br /> Stockton Terminal. The application includes a Licensed Contractors Declaration (LCD) from <br /> Spectrum Exploration. Also attached is the confirmation for my online payment for the well <br /> destruction permit. <br /> Amy Terrell told me today that she will either call you or send you a letter to indicate <br /> her approval of our work plan. <br /> Once you have a chance to review the materials, please reply to all to let Brenda <br /> Crawford/Spectrum Exploration, Robert Pexton/CH2M HILL, and me know whether you approve <br /> the application to issue a permit and to confirm the appointment for monitoring well <br /> abandonment next Wednesday October 24th. <br /> Thanks in advance, <br /> Sandi Shearer, P.E. <br /> Environmental Engineer <br /> CH2M HILL/RDD <br /> Phone: 530 .229.3354 <br /> Fax: 530.339.3354 <br /> 2525 Airpark Drive <br /> Redding, CA 96001 <br /> Sandra.Shearer@ch2m.Com <br /> -----Original Message----- <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Wednesday, October 17, 2007 8:16 AM <br /> To: Shearer, Sandra/RDD <br /> Subject: RE: Koppel KP-11S <br /> I cannot confirm an appointment on a permit that has not been issued. However, I have <br /> reserved Oct 24 for this activity. <br /> Assuming you get me all the required items I need to issue the permit with enough time to <br /> actually process it all, that date will work. Please don't expect me to be the last item <br /> on your checklist and to meet your schedule if you do not provide me with the time I need <br /> to do my job. ALL the paperwork is to be on my desk NLT Friday, October 19, by 4pm. This <br /> is the latest time. . .earlier would be better. <br /> If later than Friday, or if items are missing or the application is incomplete, you may <br /> have to reschedule since I won't have time to process and issue the permit. <br /> As for my PPE, I will be in my truck outside of the safety/hot zone for the procedure. <br /> Plan on having some one either call in the details to me there relay the info/questions to <br /> me. I will not be suiting up in Level C or B and I will not be entering the <br /> controlled/restricted area during this process. <br /> 1 <br />