Laserfiche WebLink
I <br /> There are many work plans and field appointments ahead of you. All of which have submitted <br /> their papers and fees when in advance of their scheduled field work. My priorities are <br /> with those who have anticipated delays and provided me with adequate time to issue. I will <br /> get to your work plan as time allows . <br /> Has Amy generated a work plan approval letter? If so I'll need to get a copy. If not, have <br /> her call me please. <br /> Michael Infurna <br /> SJCEHD <br /> (209) 468-3454 . <br /> -----Original Message----- <br /> From: Sandra.Shearer@CH2M.com [mailto:Sandra.Shearer@CH2M.com] <br /> Sent: Tuesday, October 16, 2007 7:32 PM <br /> To: aterrell@waterboards.ca.gov; Mike Infurna [EH] <br /> Subject: RE: Koppel KP-11S <br /> Hi, Amy and Michael, <br /> Attached are the following documents in support of abandoning Monitoring Well KP-11S at <br /> the Koppel Stockton Terminal: <br /> 1. Statement of Work for CH2M HILL's subcontractor, Spectrum Exploration, detailing well <br /> destruction methodology 2. KP-11S Soil Boring Log 3. KP-11S Well Construction Diagram 4. <br /> Site Map showing location of KP-11S <br /> KP-11S was damaged following the collapse of a warehouse operated by Headwaters Resources <br /> in early March 2007, and consequently KP-11S could not be sampled in March or August 2007 . <br /> In August 2007, the bottom of Well KP-11S was measured at a depth of 10.8 feet bgs. The <br /> total well depth following construction in July 2006 was 24 feet bgs, indicating this well <br /> is obstructed or partially filled with debris. Well KP-11S is scheduled to be abandoned <br /> next Wednesday, October 24. <br /> Michael, please confirm that you are still available on October 24th to oversee well <br /> drilling and abandonment. You will need to have the PPE specified in the attached <br /> Statement of Work (Level C PPE) , including a full-face air-purifying respirator with Hepa <br /> filter cartridges (GME-H cartridges or equivalent) . Please confirm what additional <br /> paperwork or information you need, the total price for the permit, and the address for the <br /> check to be sent. <br /> Amy, please indicate your approval of KP-11S well abandonment or let me know what <br /> additional information is required. <br /> Thanks in advance, <br /> Sandi Shearer <br /> Sandi Shearer, P.E. <br /> Environmental Engineer <br /> CH2M HILL/RDD <br /> Phone: 530.229.3354 <br /> Fax: 530.339.3354 <br /> 2525 Airpark Drive <br /> Redding, CA 96001 <br /> Sandra.Shearer@ch2m.com <br /> -----Original Message----- <br /> From: Amy Terrell [mailto:aterrell@waterboards.ca.gov] <br /> Sent: Tuesday, October 02, 2007 10 :51 AM <br /> To: Shearer, Sandra/RDD <br /> Subject: Koppel KP-11S <br /> Sandi, <br /> 2 <br />