Laserfiche WebLink
• Page 3 of 5 <br /> • <br /> Please address each of the numbered/underlined items above as quickly as you can. I cannot <br /> verify your drill date until the permit has be completely processed and I can't process your <br /> application until all of the missing items are here. <br /> I recommend you set up a PLAN B with your driller if you don't think you can provide the EHD <br /> with all the items needed with enough time for me to process it. <br /> Currently, there are four other applications on my desk in different states of submittals ahead <br /> of you. first one with a complete packet, gets processed. <br /> thank you. <br /> Mike Infurna <br /> SJCEHD <br /> From: Abe.Northup@CH2M.com [mailto:Abe.Northup@CH2M.com] <br /> Sent: Friday, July 01, 20114:40 PM <br /> To: Mike Infurna [EH] <br /> Cc: Daisy.Wei@CH2M.com; BryanCook@wdcexploration.com <br /> Subject: RE: Koppel Stockton Terminal - Soil Boring Permits <br /> Hello Mike, <br /> The permit application materials for the borings at the Koppel Stockton Terminal site are attached,which <br /> include(as previously discussed on the phone): <br /> 1. MFR form <br /> 2. Permit application <br /> 3. Permit fee receipt <br /> 4. Final Work Plan <br /> 5. Copy of Water Board approval of Work Plan <br /> This work is going to be performed by WDC Drilling. <br /> We would like to perform the work July 11-13. We previously discussed that you needed the permit <br /> application materials on July 5 to make those dates happen. If you need anything else or have questions <br /> please let me know. <br /> Bryan, please authorize your signature as the C-57 licensed driller for this work. <br /> Thanks, <br /> Abe <br /> Abe Northup <br /> CH2M HILL <br /> 155 Grand Ave <br /> Suite 800 <br /> Oakland, CA 94612 <br /> Direct-Oakland: 510.587.7752 <br /> 7/5/2011 <br />