My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:51:48 PM
Creation date
1/31/2020 3:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 8 <br /> per hour for labor, $90 per hour for equipment). However, I doubt Baylor could be the one to <br /> reconstruct the ramp, as they wouldn't have compaction equipment, etc. <br /> 11. Other subcontract documents that will be needed if we move forward with abandonment <br /> (including SOW and permit for KP-11 S, etc)are on the LAN under <br /> \\Odin\Proj\Chevron\320184\Subcontractor Procurement\SpectrumExploration\2007. <br /> For now, please save serve any pertinent work on the LAN under\\Odin\Proj\Chevron\320184 <br /> \Subcontractor Procurement\SpectrumExploration\2007-KP5S-5D. <br /> Thanks for your help. <br /> Sandi <br /> From: Shearer, Sandra/RDD <br /> Sent: Tuesday, October 23, 2007 10:20 PM <br /> To: 'Graham, Matt P'; dbuccolo@cctrailroad.com <br /> Cc: Garcia, Hector A <br /> Subject: RE: BNSF Railway - Easements and Access <br /> Matt and Dave, <br /> As our next step, we will develop an engineering estimate for abandoning these two wells, and <br /> replacing them if necessary. Dave, would you be available to meet our geologist Roger Lucich <br /> onsite later this week or early next week to do a brief site visit and discuss what would be needed <br /> to uncover these wells for abandonment? <br /> Thanks, <br /> Sandi <br /> From: Graham, Matt P [mailto:Matt.Graham2@BNSF.com] <br /> Sent: Tuesday, October 23, 2007 9:16 AM <br /> To: Shearer, Sandra/RDD <br /> Cc: dbuccolo@cctrailroad.com; Garcia, Hector A <br /> Subject: RE: BNSF Railway - Easements and Access <br /> Sandra, do you have an engineering estimate for abandoning and reinstalling the two wells? <br /> Matt Graham <br /> BNSF Environmental <br /> (909)386-3081 <br /> From: Sandra.Shearer@CH2M.com [mailto:Sandra.Shearer@CH2M.com] <br /> Sent: Monday, October 22, 2007 5:32 PM <br /> To: dbuccolo@cctrailroad.com; Garcia, Hector A; Graham, Matt P <br /> Subject: RE: BNSF Railway - Easements and Access <br /> Hi, Dave, Matt, and Hector, <br /> I was following up on my email last week regarding the monitoring wells south of the <br /> Koppel Stockton Site. <br /> Please let me know what input you have on the questions below. It would be great to <br /> 8/24/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.