My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:51:48 PM
Creation date
1/31/2020 3:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ <br /> Page 2 of 2 <br /> • Placing bollards around wells KP-7S, KP-70, KP-8S, KP-9S, and KP-12S on parcel 145-03-009 <br /> (listed parcel address of 2526 West Washington Street) <br /> • Abandoning well KP-10S and installing a replacement well KP-10S-R next to the original well on <br /> parcel 145-03-009 (listed parcel address of 2526 West Washington Street) <br /> • Abandoning well KP-BG-1 on parcel 145-08-016 (listed parcel address of 433 Los Angeles <br /> Avenue) <br /> We recently found out the County Well Permit worker is planning a long vacation at the end of the <br /> month and would like to get the Permit requests to the County ASAP to allow for sufficient review time. <br /> If there is any way approval can be provided by the end of this week or the beginning of next week that <br /> would be greatly appreciated. All we would need now is acceptance for the well abandonments and <br /> replacement.The bollard issue is not part of the well permit and can be discussed further prior to <br /> mobilizing mid-September. Please feel free to call me with any questions or concerns.Thanks. <br /> Josh Bale,P.E. <br /> Associate Environmental Engineer <br /> CH2M HILL <br /> 2525 Airpark Drive <br /> Redding, CA 96001 <br /> E-mail:Lbale@qb_2m.com <br /> Office:530-229-3451 <br /> Fax:530-243-1654 <br /> 8/23/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.