My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:47:42 PM
Creation date
1/31/2020 4:02:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1 INTRODUCTION AND BACKGROUND <br /> to improve conditions for phytoremediation effectiveness around Monitoring Well KP-3.The western part of <br /> the former bagging plant area is not being addressed as part of this interim remedial action because the trees <br /> in that area appear to be healthy, but trees in the eastern former bagging plant are predominantly dead or <br /> moth infested. <br /> • Locate Monitoring Wells KP-75, KP-71),and KP-95,which have been buried beneath road base at the Port of <br /> Stockton. <br /> • Properly destroy Monitoring Wells KP-7S,KP-71D, and KP-8S,which are no longer sampled as part of the <br /> annual groundwater monitoring. <br /> 1 .4 Work Plan Organization <br /> This work plan is organized as follows: <br /> • Section 1 presents the background of the Koppel Stockton Terminal and the scope and organization of this <br /> work plan. <br /> • Section 2 describes the approach for implementing the interim remedial action. <br /> • Section 3 describes the approach for IcKow4 Monitoring Wells KP-7S, KP-71),and KP-9S and destroying <br /> groundwater Monitoring Wells 11P 7% KP 711) and KP-8S. <br /> • Section 4 identifies the anticipAW sclhe0rle kx the interim remedial action,well location and destruction, <br /> and subsequent reporting. <br /> • Section 5 lists the references war w1 snar.e tins work plan. <br /> 1-3 <br /> RDD/131490001(CAH5I52.DOCX) <br /> ES052913233837 <br />
The URL can be used to link to this page
Your browser does not support the video tag.