Laserfiche WebLink
• KOPPEL.STOCKTON TERMINAL <br /> MONITORING WELL INSTALLATION WORK PLAN <br /> 6.0 References <br /> C112M HILL. 1996.Environmental Investigation at the Koppel Station Terminal.September. <br /> CH2M HILL. 1998. Quarterly Groundwater Monitoring Report,June 1998. Koppel Stockton <br /> Terminal, Stockton,California.July. <br /> CH2M HILL.1999.Monitoring Well Installation Report. Koppel Stockton Terminal, Stockton, <br /> California.August. <br /> CH2M HILL.2000.Final Remedial Action Report,Koppel Stockton Terminal, Stockton,California. <br /> July- <br /> Karsyn Environmental.2004. Groundwater Monitoring Report,March 2004,Former Cal Farm <br /> Supply Company.May 6. <br /> RWQCB.2004. Letter from Amy Terrell to Robert Mihalovich regarding"Transmittal of <br /> Draft Monitoring and Reporting Program,Koppel Stockton Terminal,2025 W.Hazelton <br /> Ave,Stockton,San Joaquin County." September 27. <br /> RDDI13201841REPORTS\2004_MONITORINGWELLWP\2004_MWELLWP.DOC 4 <br />