My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
2025
>
2900 - Site Mitigation Program
>
PR0505804
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:47:42 PM
Creation date
1/31/2020 4:02:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505804
PE
2960
FACILITY_ID
FA0007013
FACILITY_NAME
KOPPEL STOCKTON TERMINAL
STREET_NUMBER
2025
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2025 W HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 Reporting <br /> Reporting for this remedial action will occur initially 3 years after remedial action imple- <br /> mentation. The next evaluation will occur at 5 years after implementation and then at 5-year <br /> intervals thereafter. <br /> 4.1 3-Year Review <br /> A 3-year review will be performed as an interim assessment of the status of this remedial <br /> action. At 3 years the criteria for success of phytoremediation will be the health of each <br /> poplar grove.It is not anticipated that significant changes to groundwater or soil will take <br /> place until the grove is fully established (approximately 4 years). Therefore,no additional <br /> groundwater or soil sampling will be performed as part of the 3-year review. The annual <br /> groundwater monitoring reports will provide time concentration plots of the groundwater <br /> quality from the existing wells and piezometers. An overall assessment of the health of the <br /> trees will be performed.The assessment will provide a written documentation of the health <br /> of each grove and provide recommendations for upgrading or modifying the maintenance <br /> of the trees,if needed. It is anticipated that by the time of the 3-year review the poplar <br /> groves will no longer require irrigation. <br /> A report will be prepared to summarize the findings of the 3-year review and to describe <br /> potential upgrades to the system(if any are proposed). <br /> 4.2 5-Year Review <br /> The 5-year review will consist of a follow-up evaluation of tree health and an evaluation of <br /> groundwater data. The criteria for success of phytoremediation at 5 years are: <br /> • Established groves of mature poplar trees <br /> • An indication that nitrogen concentrations in the groundwater continue to be stable <br /> The trees will be assessed to verify that the poplar groves are maturing and established, and <br /> to provide any additional recommendations for upgrades. <br /> Groundwater quality data will be evaluated. Time-concentration plots will be presented to <br /> evaluate trends in nitrogen concentrations for the first 5 years. Soil sampling will be per- <br /> formed and the soil will be analyzed for the constituents discussed above. <br /> Findings of the 5-year review will be presented in a report. Changes or modifications to the <br /> sampling frequency will be discussed if appropriate.If the poplar groves are not fully <br /> established or if groundwater concentrations do not show any indication of stabilization, <br /> options for contingency(presented below)will be included in the report as well. <br /> The 5-year review will also evaluate the possibility of changing the frequency of sampling <br /> from semi-annuals to annual sampling. <br /> ' RDD/00367D317.DOC(CAH710.DOC) 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.