My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HILDRETH
>
10285
>
3000 – Underground Injection Control Program
>
PR0523204
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2020 5:27:57 PM
Creation date
1/31/2020 4:18:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
WORK PLANS
RECORD_ID
PR0523204
PE
3030
FACILITY_ID
FA0015585
FACILITY_NAME
PENNINGTON, SUNG HI
STREET_NUMBER
10285
Direction
N
STREET_NAME
HILDRETH
STREET_TYPE
RD
City
STOCKTON
Zip
95212
APN
08653026
CURRENT_STATUS
02
SITE_LOCATION
10285 N HILDRETH RD
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07 December 2004 <br /> AGE-NC Project No. 04-1233 <br /> Page I of 4 <br /> The septic tank was inspected by Michael Infurna of SJCEHD on 17 November 2004. After visual <br /> inspection of the interior of the septic tank,Mr.Infurna recorded the septic tank as being serviceable. <br /> 3.0. SCOPE OF WORK <br /> AGE proposes to collect soil samples to determine if petroleum hydrocarbon and/or volatile organic <br /> hydrocarbons-impacted soil is present beneath the site.The preliminary site assessment will include <br /> the following tasks: <br /> • Permitting and pre-field work activities; <br /> • Partial excavation of sampling locations; <br /> • Soil sample collection and analysis; and <br /> • Report preparation. <br /> 3.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> A site assessment boring permit will be obtained from the SJCEHD for all on-site boring locations. <br /> In addition, a health and safety plan will be prepared in accordance with Occupational Safety and <br /> Health Guidance Manual for Hazardous Waste Site Activities(National Institute for Occupational <br /> Safety and Health Administration, U.S. Coast Guard and U.S. Environmental Protection Agency, <br /> 1985). <br /> 3.2. PARTIAL EXCAVATION OF SAMPLING LOCATIONS <br /> Using the septic system installation permit on file with SJCEHD, AGE will locate the distribution <br /> box,the 90 degree joint and the end of each leach line.Each of the above areas along with sampling <br /> areas located at each 20 foot section of leach line will be exposed for inspection by SJCEHD. <br /> 3.3. SOIL SAMPLE COLLECTION AND ANALYSIS <br /> AGE proposes to advance eleven soil borings utilizing GeoProbe "direct-push" techniques: one <br /> boring will be advanced angling beneath the septic tank, one boring will be located under the <br /> distribution box(D-Box)and one boring will be located under the 90 degree connection on leach line <br /> 2. The leach line borings will be located directly below the leach line trenches at 20 foot intervals <br /> Adwnced GcoEnvironmenml,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.