Laserfiche WebLink
V V <br /> i <br /> Ms.Margaret Lagorio, SJCEHD November 30,2007 <br /> Work Plan for Additional Assessment Project No.2033-15688-01 <br /> 15688 Harlan Road,Lathrop,California <br /> Page 8 <br /> I <br /> Task 4: Technical Summary'Report <br /> Stratus will prepare and submit a report to the SJCEHD within 60 days following the <br /> completion of the proposed fieldwork. The report will document field activities and will <br /> include, but not be limited to, a scaled site plan, boring logs, tabulated analytical <br /> summaries, a groundwater potentiometric map, a discussion of results, and <br /> recommendations for additional work, if appropriate. In addition, the report will <br /> document any modifications from the approved plan. <br /> F <br /> I <br /> 4 <br /> f <br /> K:Uoc's Truck Plaza\Work Plans\Joe's Truck-SOUTH PARCEL-WP for Site Assessment 11-30-07.doc 5TKA TU5 <br /> 1 <br />