My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012721
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
5400
>
3500 - Local Oversight Program
>
PR0545276
>
ARCHIVED REPORTS_XR0012721
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 9:55:55 AM
Creation date
2/3/2020 8:25:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012721
RECORD_ID
PR0545276
PE
3528
FACILITY_ID
FA0004997
FACILITY_NAME
PLUG CONNECTION LLC
STREET_NUMBER
5400
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06106019
CURRENT_STATUS
02
SITE_LOCATION
5400 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> E rGJune ].990 <br /> MSa166A <br /> • <br /> All contractor or subcontractor pa sonnel scall bring to the <br /> attention of the site safety officer or resident project <br /> representative any unsafe condition or practice associated <br /> with the work activities that they are unable to correct <br /> themselves. <br /> There will be no smoking, eating, chewing gum, or drinking in <br /> the contamination zone. <br /> �— Hands shall be thoroughly cleaned prior to smoking, eating, or <br /> other activities outside the contamination zone. <br /> Team members must avoid unnecessary contamination (i.e., <br /> spected "hot" zones or contaminated <br /> walking through known or su <br /> puddles, kneeling or sitz'-,e& on the ground, leaning against <br /> potentially contaminates, barrels or equipment. <br /> Respiratory devices :day not be worn with beards, long side- <br /> �� burns, or under other conditions that prevent a proper seal. <br /> PLAN ACCEPTANCE <br /> All personnel involved with this project are required to read this <br /> Health and Safety Plan and sign in the space below that they have read this plan <br /> and understand its requirements. Prior to beginning work on the first day of the <br /> ^~ project, the site safety officer shall conduct a site safety meeting to explain <br /> are <br /> ar with it. <br /> the requirements <br /> meetin this <br /> shall be held ensure <br /> at the t beginning nofl f l <br /> each orkday of the <br /> s <br /> Site safety g <br /> project. <br /> -- GH:JS:ts/24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.