My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
375
>
2900 - Site Mitigation Program
>
PR0540905
>
SITE INFORMATION AND CORRESPONDENCE_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 9:16:04 AM
Creation date
2/3/2020 8:48:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0540905
PE
2960
FACILITY_ID
FA0023406
FACILITY_NAME
SIERRA LUMBER MANUFACTURERS
STREET_NUMBER
375
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
147120808
CURRENT_STATUS
01
SITE_LOCATION
375 W HAZELTON AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> Pp 111N SAN JOAQUIN COUNTY <br /> 10 �J CpG <br /> A Donna K. Heran, R.E.H.S. Program Coordinators <br /> Director 304 East Weber Avenue,Third Floor Carl Borgman, R.E.H.S. <br /> Laurie A. Cotulla,R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S.,R.D.I. <br /> Assistant Director Margaret Lagorio,R.E.H.S. <br /> vFaa" Telephone: (209)468-3420 Robert McClellan,R.E.H.S. <br /> Fax: (209)464-0138 Jeff Carruesco,R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Kasey Foley, R.E.H.S. <br /> SIERRA LUMBER <br /> P O BOX 6216 <br /> STOCKTON CA 95207 <br /> RE: 375 Hazelton Ave Site Code: 1144 <br /> Stockton Ca <br /> WORK PLAN: Work Plan Addendum/Post Remediation Confirmation Sampling <br /> DATED: November 6,2006 - <br /> PREPARED BY: AGE <br /> APPROVED: rXl <br /> Del ED: E Jr <br /> SEEDED: Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN[H&S 25299.37(c)(3)]: <br /> 1. To install two additional soil borings in former source area. <br /> 2. To collect soil vapor samples at 5 and 10 feet below ground surface in each boring. <br /> 3. To collect soil samples from the borings and submit selected samples to a State Certified Lab for chemical <br /> analyses. <br /> 4. To analyzed samples for THP-gas,BTEX and fuel oxygenates. <br /> 5. To complete and submit a report to EHD after soil boring installation and sample analysis. Any positive results <br /> must be evaluated for soil vapor transport and leaching potential. <br /> COMMENTS AND CONDITIONS: <br /> 1. Soil samples with elevated field PID measurements must be submitted for chemical analysis. <br /> 2. AGE must procure the required EHD permits prior to beginning work. <br /> 3. The report of findings must be submitted to EHD for evaluation by June 1,2007. <br /> DATED !l� 6&7 BY <br /> Harlin Knoll,Senior REHS(209)468-3442 <br />
The URL can be used to link to this page
Your browser does not support the video tag.