My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
375
>
2900 - Site Mitigation Program
>
PR0540905
>
SITE INFORMATION AND CORRESPONDENCE_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 9:16:04 AM
Creation date
2/3/2020 8:48:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0540905
PE
2960
FACILITY_ID
FA0023406
FACILITY_NAME
SIERRA LUMBER MANUFACTURERS
STREET_NUMBER
375
Direction
W
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
147120808
CURRENT_STATUS
01
SITE_LOCATION
375 W HAZELTON AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALT#DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K.Heran,R.E.H.S. Carl Bor an,R.E.H.S. <br /> Director� 304 East Weber Avenue, Third Floor gr'r <br /> s., . Mike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> dq. FORA P . Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. Fes; (209) 464_0138 Robert McClellon,R.E.H.S. <br /> Program Manager - - Mark Barcellos,R.E.H.S. <br /> SIERRA LUMBER <br /> P O BOX 6216 <br /> STOCXTON CA 95207 rr COPY RE: 375 Hazelton Ave r F Q Site Code:1144 <br /> Stockton Ca FILE <br /> WORK PLAN: Remedial Action Work Plan addendum <br /> DATED: March 19,2004 <br /> PREPARED BY: AGE <br /> APPROVED: <br /> DISAPPROVED: <br /> ADDENDUM NEEDED: Submit by: <br /> ADEO,1`JATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25299.37 (c)(3)]: <br /> 1. To install one additional soil vapor extraction well 20 feet southwest of existing MW 2. <br /> 2. To install one additional ground water air sparge well 5 feet northeast of existing MW 2. <br /> 3. To collect soil samples from the borings and submit selected samples to a State Certified Lab for <br /> chemical analyses. <br /> 4. To trench,install piping,and connect the two additional wells to the existing remedial system and <br /> continue to perform corrective action(SVE with IAS). <br /> 5. To continue to sample ground water and vapor as required by the appropriate regulatory agencies. <br /> 6. To complete and submit a report after installation and operation/testing which will include conclusions <br /> and recommendations. <br /> CO—N a[ENTS AND CONDITIONS <br /> 1. Only soil samples with elevated field PID measurements can be submitted for chemical analyses. , <br /> 2. AGE must procure the required EHD well installation permit prior to beginning work. <br /> 3. AGE must procure other appropriate agency permits as required. <br /> DATED 41115101 BY 4. <br /> Harlin KnollSenior REHS (209)468-3442 <br />
The URL can be used to link to this page
Your browser does not support the video tag.