Laserfiche WebLink
L f <br /> k <br /> TABLE OF CONTENTS <br /> Page <br /> 10 INTRODUCTION 1 <br /> 20. BACKGROUND 1 <br /> 21 SITE DESCRIPTION I <br /> 22 PREVIOUS INVESTIGATION I <br /> I <br /> 23 REGIONAL GEOLOGIC SETTING 3 <br /> 24 GROUND WATER DEPTH AND FLOW DIRECTION 3 <br /> 30 SCOPE OF WORK 4 <br /> 31 PERMITTING,PLANNING AND PRE-FIELD WORK ACTIVITIES 4 <br /> 32 INSTALLATION OF REMEDIATION WELLS 5 <br /> 33 INSTALLATION OF SOIL VAPOR EXTRACTION/AIR SPARGING PIPING SYSTEM 5 <br /> 34 SOIL VAPOR EXTRACTION START-UP PERIOD 6 <br /> 35 MONITORING AND MAINTENANCE ACTIVITIES 6 <br /> 36 PROGRESS/CONFIRMATION SAMPLING 7 <br /> R 4.0. PROCEDURES 7 <br /> 4'1 DRILLING ACTIVITIES 8 <br /> 42 SOIL VAPOR EXTRACTION SYSTEM DESIGN 8 <br /> I 4 2 1 Soil Vapor Extraction Well Installation 8 <br /> 422 Soil Vapor Extraction Piping System 9 <br /> 4 2 3 Soil Vapor Extraction Supplemental Fuel 9 <br /> 424 Soil Vapor Extraction Monitoring Activities 9 <br /> 43 IN-SITU AIR SPARGING SYSTEM DESIGN 10 <br /> 43 1 In-Situ Air Sparging,Well Installation 10 <br /> 4 3 2 In-Situ Air,Sparging Pipmg System 11 <br /> I 4 3 3 In-Situ Air Sparging Monitoring Activities 11 <br /> 44 PERMITTING 11 <br /> 45 SOIL VAPOR EXTRACTION/1N-SITU AIR SPARGING SYSTEM MAINTENANCE 11 <br /> 46 PROGRESS/CONFIRMATION SOIL SAMPLING 12 <br /> LIST OF FIGURES <br /> Figure 1,-Location Map <br /> Figure 2 -Site Plan <br /> Figure 3 -Proposed Soil vapor Extraction Well,Locations <br /> Figure 4 -Proposed In-Situ Aar Sparging Well Locations <br /> Figure 5 -Proposed Piping System - <br /> I Figure 6-Proposed Remediation System Design <br /> Figure 7 -Proposed Soil Vapor Extraction Well Design <br /> Figure 8 -Proposed In-Situ Aar Sparging Well Design <br /> LIST OF APPENDICES <br /> Appendix A-Additional Information <br /> I , Advanced GeoEnviroomental,Inc <br /> I <br />