Laserfiche WebLink
San Joaquin County <br /> s;;" Environmental Health Department DIRECTOR <br /> Donna Heran,REHS <br /> 600 East Main Street <br /> o <br /> r' Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> I�-l; fro--' '� Robert McClellan,REHS <br /> L <br /> /'"J Jeff Carruesco,REHS,RDI <br /> Website: www.sjg . g/ehd Kasey Foley,RENS <br /> bitovor <br /> Linda Turkatte,REHS <br /> Phone: (209) 468-3420 <br /> Fax: (209) 464-0138 <br /> SIERRA LUMBER <br /> P0BOX 6216 <br /> STOCKTON, CA 95207 <br /> RE: Sierra Lumber (Case 2) Site Code: 1144 <br /> 375 Hazelton Ave. <br /> WORK PLAN: Remedial Action Work Plan (DPE) <br /> DATED: October 10, 2011 <br /> PREPARED BY: AGE <br /> APPROVED: [X] <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10 (c)(3)]: <br /> 1. To secure the required permits from the City of Stockton, the San Joaquin Valley Unified <br /> Air Pollution Control District, and the San Joaquin County Environmental Health <br /> Department to construct and operate an on-site dual phase extraction (DPE) ground <br /> water remediation system. <br /> 2. To install an additional DPE well, to advance an additional soil boring, and to collect soil <br /> samples for analysis and evaluation. <br /> 3. To sample remediation wells to establish baseline concentrations prior to DPE startup. <br /> 4. To install the necessary DPE equipment and piping and to operate the DPE remediation <br /> system continuously including monitoring and sampling of ground water and soil vapor. <br /> COMMENTS AND CONDITIONS: <br /> 1. Continue with scheduled ground water monitoring, sampling, and reporting. <br /> 2. Submit remediation report to the EHD, the CVRWQCB, and the GeoTracker website. <br /> 3. Notify immediately all Record Fee Title Owners of this property of the pending <br /> Corrective Action. <br /> DATE BY7 <br /> Harlin Knoll, Senior REHS (209)468-3442 <br /> Cc: Tim Cuellar, AGE, 837 Shaw Road, Stockton, CA 95215 <br />