My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013090
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
20500
>
3500 - Local Oversight Program
>
PR0541264
>
ARCHIVED REPORTS_XR0013090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 10:02:06 PM
Creation date
2/3/2020 9:50:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013090
RECORD_ID
PR0541264
PE
3528
FACILITY_ID
FA0023641
FACILITY_NAME
FORMER HOLLY SUGAR FACILITY
STREET_NUMBER
20500
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
20500 HOLLY DR
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2.6.2 Monitoring Well Development i <br /> r <br /> On February 15, 2011, Dei-Tech Geotechnical Support Services (Del-Tech) developed the new <br /> groundwater monitoring well. Purge water was stored in Department of Transportation (DOT) <br /> approved 55-gallon poly drums pending analytical results. Del-Tech's well development field <br /> f notes are included in Attachment E. <br /> f <br /> 2.7 Groundwater Monitoring k <br /> On February 18,2011, Del-Tech measured the static depth to water in MW-BR prior to purging and <br /> samplingthe well. Depth to groundwater was 8.68 feet <br /> � �' Lgs. trig to sample collection, a minimum <br /> of three well casing volumes were purged from the well. Groundwater samples were collected for <br /> analysis after water in the casing recharged to>90%of pre-purged levels. <br /> Groundwater samples were collected with Waterra inertia pump and dedicated tubing with a check <br /> valve. The water was carefully decanted into the appropriated containers, checked for headspace, <br /> uniquely labeled, placed into an ice chest cooled to approximately 4°C, and transported to Argon i <br /> under chain of custody protocol for analysis. r <br /> Y <br /> On March 21, 2011, Del-Tech measured the static depth to water in MW-BR prior to purging and r <br /> sampling the well. Depth to groundwater was 7.96 feet bgs. Prior to sample collection, a minimum <br /> of three well casing volumes were purged from the well. Groundwater samples were collected for <br /> analysis after water in the casing recharged to >90% of pre-purged levels. Groundwater samples <br /> were collected following the protocol above. <br /> e <br /> Purge water was contained in properly labeled DOT approved 55-gallon poly drums pending <br /> analytical. Del-Tech's monitoring data sheets are included in Attachment F. <br /> 2.7.1 Analytical Results <br /> During both groundwater monitoring events, groundwater samples were analyzed for::: <br /> • (TPHg) and Total petroleum hydrocarbons as diesel(TPHd)by EPA method 8015M <br /> • BTEX and fuel oxygenates b EPA method 8260B <br /> Yg Y � <br /> Laboratory analytical results indicate that no analyzed constituent was reported above laboratory <br /> detection limits during either of the February 18, 2011 and March 21, 2011 groundwater ' <br /> monitoring events. Analytical results are summarized in Table 6. The laboratory analytical <br /> I <br /> report is included in Attachments A-7. <br /> i <br /> - 10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.