Laserfiche WebLink
ENVIF10,4MENTAl�t CHEALTH <br /> - �. E <br /> �il� <br /> *1_11:101 GROUNDWATER 95 JAN 17 PPS I: 4 <br /> 2 <br /> EIEDTECHNOLOGY, INC. 1401 Halyard Drive,Suite 140,West Sacramento,CA 95691,(916)372-4700 <br /> FAX(916)372 8781 <br /> January 13, 1995 <br /> Mr Harlan Knoll <br /> San Joaquin Public Health Services <br /> Environmental Health Division <br /> P O Box 2009 <br /> Stockton, CA 95201 <br /> Subject Work Plan for Well Installation and Testing <br /> San Joaquin Catholic Cemetery <br /> Cemetery Lane and Harding Way <br /> Stockton, California <br /> GTI Project 02070 0081 <br /> Dear Mr Knoll <br /> Groundwater Technology, Inc submits this letter as a work plan for well installation and feasibility <br /> • testing at the San Joaquin Catholic Cemetery site located at Harding Way and Cemetery Lane in <br /> Stockton, California (Figure 1) This work plan is submitted to the San Joaquin Public Health <br /> Services - Environmental Health Division (SJCPHS-END) to fulfill the requirements of the County and <br /> the California Regional Water Quality Control Board - Central Valley Region (CRWQCB-CVR) The <br /> scope of work is designed as a preliminary step to site remediation Specifically the scope of work <br /> includes the installation and testing of four soil vapor extraction points in hydrocarbon-impacted <br /> areas on site defined by previous soli and groundwater investigations (RESNA, 1994) Details of the <br /> scope of work are described below <br /> TASK 1 SITE-SPECIFIC HEALTH AND SAFETY PLAN/PERMITTING/UTILITY <br /> CLEARANCE <br /> I <br /> Groundwater Technology has prepared a site-specific Health and Safety Plan as required by the <br /> Occupational Health and Safety Administration (OSHA) Standard "Hazardous Waste Operations and <br /> Emergency Response" guidelines (29 CFR 1910 120) The Health and Safety Plan will be reviewed <br /> and signed by all Groundwater Technology personnel and subcontractors prior to executing work at <br /> the site <br /> Groundwater Technology has conducted a technical review of all pertinent information associated <br /> with the site Local permits pertaining to vapor extraction well installation will be obtained from the <br /> SJCPHS-EHD Prior to conducting subsurface work at the site, Underground Service Alert (USA) will <br /> Offices throughout the U S,Canada and Overseas <br />