My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002570
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
1112
>
3500 - Local Oversight Program
>
PR0545263
>
ARCHIVED REPORTS_XR0002570
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 6:58:03 PM
Creation date
2/3/2020 10:50:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002570
RECORD_ID
PR0545263
PE
3528
FACILITY_ID
FA0005108
FACILITY_NAME
EGGIMANS HYDRAULIC GARAGE
STREET_NUMBER
1112
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15102101
CURRENT_STATUS
02
SITE_LOCATION
1112 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report Preparation <br /> • <br /> Upon completion of all field activities, a summary report will be prepared for submittal to <br /> PHSIEHD. Smith Technology will prepare a report that will include a description of all field <br /> activities, laboratory analytical results, boring logs, and recommendations. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. A completed Site Safety Plan (SSP) is contained in Attachment <br /> 1 and a Quality Control/Quality Assurance Plan is contained in Attachment 2. All field work will <br /> be completed in accordance with these plan. <br /> Projected Schedule <br /> Once approval of this workplan has been received, Smith Technology will schedule drilling <br /> activities. It is anticipated the drilling will be completed in one day and drilling has been <br /> tentatively scheduled for July 24, 1997. Smith Technology will notify PHS/EHD at least 48 hours <br /> prior to beginning any field activities. The summary report will be submitted to PHS/E1-1D <br /> approximately four to five weeks after the completion of field activities. <br /> If you have any questions or require additional information regarding this workplan, please <br /> contact us at (209) 579-2221. <br /> • Respectfully Submitted, <br /> Smith Technology Corporation, <br /> AA,(- <br /> Drew Van Allen <br /> Staff Scientist <br /> -'�Ir. <br /> Tom Lutterman Q�pFESSlGA,,q� <br /> Project Geologist c�0JEANNE <br /> F <br /> KWASEY _ <br /> NO.C047410 <br /> Jeanne Homsey, P.E. Earp. U- � <br /> Registered Engineer No. C47410 J,�'9� CIVI <br /> Attachments OF CA�.�F <br /> Pc: Mr. Robert Eggiman -Eggiman, Andrew and Edith Trust <br /> Regional Water Quality Control Board <br /> w:1977361reporlslwkp.doc 7/11/97 3 <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.