My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
3500 - Local Oversight Program
>
PR0545273
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 12:04:40 PM
Creation date
2/3/2020 11:07:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545273
PE
3528
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
02
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Margaret Lagorio,SJCEHD <br /> February 2,2005 <br /> Interim Remedial Action Plan <br /> Joe's Truck Plaza, Lathrop,California <br /> Page 5 <br /> Task 5— Operation and Maintenance <br /> After system start-up and optimization, a Stratus technician will visit the site twice each <br /> month to monitor system operation and to perform maintenance on the GETS. Data <br /> collection will include measurement of groundwater extraction and discharge rates, and <br /> compliance groundwater samples may be collected for laboratory analysis. The <br /> frequency of the site visits and laboratory analysis may vary based on permit conditions, <br /> but at a minimum will be performed on a quarterly basis. <br /> Task 6— Reporting <br /> A system start-up report, documenting the groundwater extraction rates, discharge rates, <br /> and mass removal estimates, will be prepared and submitted to the discharge permitting <br /> agency. After the initial system start-up report, data collected during operation and <br /> maintenance site visits will be presented in the quarterly monitoring reports. <br /> SCHEDULE <br /> Stratus has initiated discharge permit procedures with the City of Lathrop; we anticipate <br /> that a discharge permit can be obtained in approximately 45 days. If an NPDES permit is <br /> required, we anticipate it could take approximately three months to secure. Upon <br /> approval of this IRAP by SJCEHD, Stratus will prepare and submit the plans and <br /> specifications for the proposed GETS. We anticipate these plans can be submitted for <br /> building permit approval within 30 days of IRAP approval. It should take approximately <br /> 30 days following building permit approval to obtain construction bids and retain a <br /> licensed contractor, and an additional 30 days to procure the equipment and install the <br /> system. <br /> K:Uoe's Truck.Plaza\Work PlansUoes IRAP 020205.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.