Laserfiche WebLink
U <br /> 4 <br /> Ms.Margaret Lagorio, SJCEHD October 21,2003 <br /> Joe's Truck Plaza Project No.2033-15600-01 <br /> Work Plan for Additional Site Assessment <br /> II <br /> Page 16 <br /> the installation of the monitoring, sparge, and extraction wells will be submitted <br /> approximately 6 weeks after completion of drilling. <br /> The feasibility testing portion of the proposed work will be scheduled to begin <br /> approximately five weeks after completion of the well installation activities. It will likely <br /> take approximately 3 weeks to complete the field portion of the feasibility testing. <br /> Stratus will submit a report of the feasibility testing activities approximately five weeks <br /> after completion of the feasibility testing field activities. <br /> Installation of the ozone generator equipment will be initiated two weeks following <br /> completion of the well installation activities (assuming that the appropriate building <br /> permits have been secured). It will likely take two to three weeks to install the ozone <br /> generator equipment and conveyance piping. SJCEHD will be notified at the completion <br /> of the installation activities, and a monitoring and sampling program designed to monitor <br /> the effectiveness of the ozone sparge system will be submitted. <br /> If you have any questions regarding this work plan, please call Steve Carter at <br /> (530) 676-6008. <br /> Sincerely, <br /> STRATUS ENVIRONMENTAL, INC. ED G <br /> No.5577 <br /> afthe R. G olsby Stephen J. Carter, R.G. N r <br /> S af ologist Project Manag <br /> �OF CA1-�F�Q� <br /> Attachments: Figure 1 Site Location Map <br /> Figure 2 Site Vicinity Map <br /> Appendix A Field Practices &Procedures <br /> cc: Mr. Jim Barton, Central Valley Regional Water Quality Control Board <br /> Mr. Kashmir Singh and Mr.Dalwinder Dhoot, property owners <br /> i <br /> P:\Joe's Truck Plaza\Work Plans\Joes workplan 102103.doc <br />