My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLLY
>
2421
>
3500 - Local Oversight Program
>
PR0545285
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 12:37:25 PM
Creation date
2/3/2020 11:47:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545285
PE
3528
FACILITY_ID
FA0006068
FACILITY_NAME
PALADIN MILEAGE CENTER
STREET_NUMBER
2421
STREET_NAME
HOLLY
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
2421 HOLLY DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> A TC Associates SITE SAFETY PLAN <br /> Job Name: Gemelos-Paladine Mileage Center ' <br /> Job Location: 2421 Holly Drive, Tracy, San Joaquin County, California <br /> Client Name:' Mrs. Elaine Kluve <br /> Project Number: 54.92054.0021 <br /> General Work Description: Well Destruction <br /> SSP Prepared by: Jim Kundert <br /> On-site Safety Officer: John Sellman <br /> Project Safety Officer: Jeanne Homsey <br /> This site health and safety plan (SSP) must be kept on-site and accessible to all on-site <br /> employees during all phases of site operations. The SSP must be reviewed and signed by all <br /> on-site employees, subcontractors, and visitors prior to entering the site. General safe work <br /> practices are',identified in the ATC's Injury and Illness Prevention Manual and apply to all <br /> ATC work sites. <br /> The provisions set-forth in this SSP shall apply to ATC employees and any subcontractors i <br /> working for ATC at the job site. All personnel working for ATC at the job site must read this <br /> SSP, and sign the attached Compliance Agreement before entering the work area. Field <br /> personnel may deviate from the safety provisions set-forth in this SSP, but only to upgrade or <br /> increase the safety requirements. ATC personnel may suspend work if unsafe working <br /> conditions are identified or observed, or unauthorized modifications to the safety provisions <br /> set-forth in this SSP are made. If changes in site or working conditions require changes in <br /> safety procedures, appropriate amendments to this SSP will be provided by the ATC project <br /> manager or supervisor, with the written approval of a ATC project safety officer or the ATC <br /> Health and Safety Director. <br /> i <br /> I <br /> PAGE 3 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.