Laserfiche WebLink
s` ) F <br /> { 0Q <br /> k <br /> r 1s <br /> ATC Associates SITE SAFETY PLAN <br /> i` <br /> On-site communications: ❑ Radio El Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio [K Telephone <br /> 3 <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: Tobe determined on-site prior_t_o beginning work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP O CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective equipment (i.e., <br /> gloves, coveralls) will be placed in 55-gallon _drums ! <br /> and stored onsite with drill cuttings. <br /> Location of Wash Water: Restroom on-site <br /> Location of Toilet: Restroom on-site <br /> Location of Drinking Water. ATC truck <br /> ,t <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP 0 CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> r, <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced during drilling <br /> activities will be stored on-site until disposal <br /> methods are determined. <br /> PAGE 11 <br /> S <br /> s J <br />