My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
3500 - Local Oversight Program
>
PR0545280
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 1:37:17 PM
Creation date
2/3/2020 11:53:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545280
PE
3526
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
02
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please refer to site map for tank locations. <br /> On June 15, 1995 a 12,000 gallon gasoline UST located to the west of the pump islands was removed from the ground. Three soil <br /> samples were collected from the native soil beneath the tank with the following results. <br /> SOIL SAMPLE RESULTS <br /> TANK#3 <br /> (ppm) <br /> SAMPLE TPH BENZENE TOLUENE ETHYL XYLENE LEAD <br /> ID GASOLINE BENZENE <br /> TK3-SOUTH 3900 <10 120 6.5 540 <5.0 <br /> 13' <br /> TK3-CENTER <1.0 <0.005 0.0056 <0.005 0.0062 <5.0 <br /> 14' <br /> T"-NORTH 8.3 <0.005 0.010 0.007 0.130 <5.0 <br /> 13' <br /> The two soil samples collected from beneath the piping (after some limited over-excavation) showed nondetectable levels of the <br /> above noted constituents. On June 28, 1995,the south end of the former UST tank pit was trenched to a total depth of 27'below <br /> ground surface. The soil was screened during the trenching using a flame ionizing detector (FID) which indicated increasing <br /> concentrations with deeper depths. The hole was then backfilled using compacted clean soil to grade. <br /> The area around this tank will need assessment to determine full extent of impact and feasibility studies to determine most <br /> cost effective approach to cleanup. <br /> The dispenser island,piping runs and other tank sites noted above(except tank#5)will need assessment and if necessary, <br /> remedial feasibility evaluation to determine the most cost effective approach to clean up. <br /> Monitoring wells need to be installed as necessary based on field measurements to determine full extent of groundwater <br /> Impact. <br /> All work noted above shall be completed, as best as possible, during one mobilization attempt <br /> WORK TO BE PERFORMED <br /> TASK 1 PLANNING AND PERMITS <br /> A. Prepare a project workplan. <br /> B. Prepare a site health and safety plan. <br /> C. Submit the workplan, the health and safety plan, a schedule of implementation, a completed permit to bore <br /> application and the associated$89.00 fee to San Joaquin County Public Health Services,Environmental Health <br /> Division (PHS/EHD)for review. <br /> TASK 2 SOIL BORING, MONITORING WELL,VAPOR EXTRACTION WELL INSTALLATION AND SAMPLING <br /> A. Drill and sample sufficient soil borings to determine the full extent of the soil contamination in and around the <br /> areas mentioned above. At least three of these soil borings must be drilled and logged continuously. The need <br /> for additional soil borings shall be determined in the field, as much as possible, using either a flame ionizing <br /> detector or a photoionizing detector (calibrated) and in consultation with PHS/EHD. <br /> B. Drill,sample and complete as monitoring wells sufficient soil borings to determine the full extent of groundwater <br /> contamination at the site. The need for additional monitoring wells shall be determined, as best as possible, <br /> using field meters as described above,on soil in the capillary fringe or the saturated zone and in consultation <br /> with PHS/EHD. <br /> C. Drill, sample and complete as soil vapor extraction test wells at least three soil borings in the area of known <br /> impact(tank#3). The construction of the vapor extraction test wells should be dependant on the soil lithology <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.