Laserfiche WebLink
V./ <br /> San Joaquin County Motor Pool Facility March 6,2001 <br /> Supplemental Contamination Assessment Workplan <br /> The report will also discuss potential soil and ground-water remedial alternatives based on <br /> field observations and analytical results including potential locations and design <br /> parameters for groundwater remediation and monitoring wells. <br /> Task 5: Quarterly Groundwater Monitoring <br /> Upon completion of the investigation TEM will initiate a quarterly groundwater monitoring <br /> program at the Site. The new and existing wells will be incorporated into the program. I <br /> The quarterly groundwater monitoring activities will be conducted by TEM in accordance <br /> with the San Joaquin County Environmental Health Division, Recommended Groundwater <br /> Sampling Guidelines <br /> PROJECT SO DULE <br /> The proposed wo can be initiated upon writte appy al of the ork plat y SJC �. II ;f <br /> final report can be submitted to t e SJ(PPHS wi in 60 da ofjc mpi tiorl; 0 th fiel to <br /> and receipt of all laboratory repo S. <br /> I � l � I � <br /> C OSURE /' ! 1, { i I 1 <br /> j/ ' 1 f <br /> S old i u have I y ujstipns re arding this work plan, pea a lon :zct any/of t e i <br /> u d rsi ed at �714)500�-8 00 a yo r convenience. <br /> I iN E I <br /> I z� i <br /> V tr I yglu s, �' 1 L� <br /> TAIT ;N IN ; M� NTANAGEMENT, INC. <br /> Scott Ek Mehmet Pehlivan, R.G., C.H. Edward A. Battle <br /> Project Geologist Senior Hydrogeologist Director <br /> Attachments: <br /> Figure 1 - Site Plan with Proposed Boring Locations <br /> Cc: Kerry Wasson, San Joaquin County Facilities Management Division <br /> Mark List, RWQCB, Central Valley Region <br /> M:\TEM2\C1ients\San Joaquin Public Works\Supplemental Contamination Assessment\Supplemental Contamination Assessment <br /> Workplan(March 2001).doc <br /> Page 5 of 5 <br />