My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
3500 - Local Oversight Program
>
PR0545280
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 1:10:42 PM
Creation date
2/3/2020 11:54:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545280
PE
3526
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
02
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V./ <br /> San Joaquin County Motor Pool Facility March 6,2001 <br /> Supplemental Contamination Assessment Workplan <br /> The report will also discuss potential soil and ground-water remedial alternatives based on <br /> field observations and analytical results including potential locations and design <br /> parameters for groundwater remediation and monitoring wells. <br /> Task 5: Quarterly Groundwater Monitoring <br /> Upon completion of the investigation TEM will initiate a quarterly groundwater monitoring <br /> program at the Site. The new and existing wells will be incorporated into the program. I <br /> The quarterly groundwater monitoring activities will be conducted by TEM in accordance <br /> with the San Joaquin County Environmental Health Division, Recommended Groundwater <br /> Sampling Guidelines <br /> PROJECT SO DULE <br /> The proposed wo can be initiated upon writte appy al of the ork plat y SJC �. II ;f <br /> final report can be submitted to t e SJ(PPHS wi in 60 da ofjc mpi tiorl; 0 th fiel to <br /> and receipt of all laboratory repo S. <br /> I � l � I � <br /> C OSURE /' ! 1, { i I 1 <br /> j/ ' 1 f <br /> S old i u have I y ujstipns re arding this work plan, pea a lon :zct any/of t e i <br /> u d rsi ed at �714)500�-8 00 a yo r convenience. <br /> I iN E I <br /> I z� i <br /> V tr I yglu s, �' 1 L� <br /> TAIT ;N IN ; M� NTANAGEMENT, INC. <br /> Scott Ek Mehmet Pehlivan, R.G., C.H. Edward A. Battle <br /> Project Geologist Senior Hydrogeologist Director <br /> Attachments: <br /> Figure 1 - Site Plan with Proposed Boring Locations <br /> Cc: Kerry Wasson, San Joaquin County Facilities Management Division <br /> Mark List, RWQCB, Central Valley Region <br /> M:\TEM2\C1ients\San Joaquin Public Works\Supplemental Contamination Assessment\Supplemental Contamination Assessment <br /> Workplan(March 2001).doc <br /> Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.