My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
3500 - Local Oversight Program
>
PR0545280
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2020 1:10:42 PM
Creation date
2/3/2020 11:54:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545280
PE
3526
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
02
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 5 <br /> 188 Frank West Cr. Suite I <br /> Stockton, CA 95206 <br /> Phone: (209) 234-0518 <br /> Fax: (209) 234-0538 <br /> Company Website: www.condorearth..co_m <br /> Condor GIS Services: www.condordataserver.com <br /> Map and Dairy Services: http•//www.condormaps.com/mwisp/ <br /> From: Bill Cook <br /> Sent: Monday, May 16, 2011 10:45 AM <br /> To: 'nhenderson@sjcehd.com'; 'hnoll@sjcehd.com' <br /> Subject: FW: Approved Remedial Feasibility Testing, 1810 E. Hazelton Ave., Stockton, CA (#1141) <br /> San Joaquin County Motor Pool UST Site <br /> 1810 E. Hazelton Ave., Stockton, CA <br /> San Joaquin County Environmental Health Department Site Code#1141 <br /> Condor Earth Technologies, Inc. is making preparations to implement the approved Remedial Feasibility <br /> Testing in general compliance with the Site Conceptual Model and Work Plan, Additional Site Investigation <br /> and Remedial Feasibility Testing, dated March 7, 2003. Pertinent sections from the approved Work Plan <br /> are copied below. We are writing to request your concurrence and authorization to make some minor <br /> changes which expand the soil vapor extraction (SVE)and air sparge (AS)testing. Condor proposes that: <br /> • SVE and AS testing be extended the from eight hours/4 hours respectively, to 20-30 hours over two to <br /> three days, <br /> • SVE testing be performed at two or more extraction rates so that results can be compared to provide <br /> greater insight in regard to subsurface conditions and provide data useful for sizing of a remediation <br /> system, <br /> • AS testing be operated in conjunction with the SVE testing and, <br /> • Add a vacuum groundwater extraction component for a portion of the pilot test to evaluate the feasibility <br /> of dual-phase extraction at the Site; no more than 3,000 gallons of groundwater would be extracted if <br /> vacuum groundwater extraction is successful. <br /> From "Site Conceptual Model and Work Plan, Additional Site Investigation and Remedial Feasibility <br /> Testing, March 7, 2003" <br /> 6/1/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.